City
Epaper

4 dams, one weir in Marathwada full

By Lokmat English Desk | Updated: September 12, 2021 22:15 IST

Aurangabad, Sept 12:Four dams in Marathwada have received 100 per cent water, while Jayakwadi dam has 56 per ...

Open in App

Aurangabad, Sept 12:

Four dams in Marathwada have received 100 per cent water, while Jayakwadi dam has 56 per cent water storage and Khadka weir is 100 per cent full and is now overflowing.

All 11 projects and two dams have a storage capacity of 5,775 million cubic meters (MCM), from which 4,017 MCM of useful water has been stored in all the projects till September 12. Last year, the division had 4,558 MCM water storage. It currently has a deficit of 541 MCM. Lower Dudhna, Majalgaon, Manjra, Penganga, Lower Terna projects are 100 per cent full. The problem of drinking water has been solved due to satisfactory supply of water in the project. Jayakwadi dam has a useful storage capacity of 1201 MCM. Due to increased flow of water from Nashik, the stock of Jayakwadi is likely to increase this week.

Open in App

Related Stories

Other SportsSabalenka beats Gauff to win third Madrid Open title

InternationalDalai Lama greets Australian PM Albanese for winning second term

NationalDalai Lama greets Australian PM Albanese for winning second term

NationalThiruvananthapuram Road Accident: Autorickshaw Catches Fire After Collision, 1 Dead, 4 Injured In Kerala (Watch Video)

InternationalPM Modi congratulates Singapore's PM Wong on election victory, commits to boosting Comprehensive Strategic Partnership

Aurangabad Realted Stories

AurangabadWoman duped of ₹3.24 lakhs in job scam

AurangabadPh D conferred on Punamchandra

AurangabadGold pendant worth 30g stolen while boarding bus

AurangabadYouth found dead by hanging

AurangabadBook ‘Unhatil Chhayadar Vriksha’ release in MGM