City
Epaper

All gates of Jayakwadi dam closed

By Lokmat English Desk | Updated: August 3, 2022 22:55 IST

Aurangabad, Aug 3:The Jayakwadi administration closed all the gates of the dam on Wednesday afternoon because of the ...

Open in App

Aurangabad, Aug 3:

The Jayakwadi administration closed all the gates of the dam on Wednesday afternoon because of the low speed of water arrival from Nashik dams.

The dam has a storage of 89 per cent. It received 58.50 TMC water from June 1 to August 3. Of them, 12 TMC water was released into Godavari basin. Water was being released at a speed of 9,432 cusecs till July 31.

A total of 10 gates (10,27,18,19,16, 21, 14, 23, 12 and 25 numbers) of the water body were closed by half a foot on August 1.

The speed of water release from the dam’s hydroelectric plant was 5,781 cusecs. The speed of water arriving in the reservoir was reduced to 1,048 cusecs till this afternoon.

So, the dam’s administration stopped water release from the dam completely in the afternoon. The gates were lifted 10 days ago in presence of the district collector. The arrival of water speed into Jayakwadi was 32,000 cusecs while water at 26,000 cusecs speed was being released in Godavari basin.

Tags: tmc
Open in App

Related Stories

ThaneThane Water Cut: TMC Announces 24-Hour Shutdown From March 27 in These Areas

NationalWest Bengal Assembly Election 2026: Polling to Be Held in Two Phases on April 23 and 29, Counting on May 4

NationalKolkata: Clashes Erupt Between TMC and BJP Supporters Before PM Modi’s Rally in West Bengal (VIDEO)

ThaneThane Water Cut News: 24-Hours Supply Disruption From March 12; Check Timing and Affected Areas

NationalPolitical Row After President Droupadi Murmu Flags Event Arrangements in West Bengal; PM Modi Calls It 'Shameful'

Aurangabad Realted Stories

AurangabadUS-Iran War to Continue for Next 6 Months

AurangabadThree assault cases emerge from minor disputes

AurangabadVC to inaugurate rare books exhibition today

AurangabadCivic Chief flags concerns over incomplete hydraulic testing of 2,500-mm pipeline

AurangabadProbe into Fake Approvals of School Staff Case Launched