City
Epaper

AMC speeds up Balasaheb Thackeray Memorial works

By Lokmat English Desk | Updated: July 2, 2022 20:25 IST

Aurangabad, July 2:The proposed development of the Balasaheb Thackeray Memorial at Priyadarshini Garden, near MGM Campus, is underway ...

Open in App

Aurangabad, July 2:

The proposed development of the Balasaheb Thackeray Memorial at Priyadarshini Garden, near MGM Campus, is underway for the last two years. Meanwhile, after witnessing topsy-turvy political changes in Maharashtra, the Aurangabad Municipal Corporation (AMC) increased the speed of the project.

The AMC city engineer S D Panzade said,” We have invited tenders to undertake myriad works on the campus of the memorial including installation of the life-size statue.”

The administration had selected the site for the memorial in 2016-17. Initially, the state government made a provision of Rs 25.50 crore in its budget to install the statue and develop the sprawling garden on 17 acres of land. Later on, the provision of an additional fund of Rs 9.70 crore was made when the initial fund was found insufficient. After 2019, the then chief minister Uddhav Thackeray took a personal interest in the memorial. Accordingly, the former guardian minister Subhash Desai reviewed the works regularly. Under the guidance of the AMC administrator A K Pandey and the city engineer S D Panzade, the AMC team comprising executive engineer BD Phad and deputy engineer R P Rajput are executing the project.

Phase I works has been completed. It includes the construction of the compound wall, planting saplings of 6,000 new trees of different species etc. The works of internal roads and other civil works are also on verge of completion. Phase II works include the erection of the statue of a height of 51 feet including the height of the pedestal.

Rs 9.70 crore tender

The AMC has invited a tender valuing Rs 9.70 crore on July 1. The works include the erection of the statue; development of an art gallery; installation of a state-of-the-art sound system; lighting system; beautification of campus and other works. The last date to submit quotations is July 25 and the tenders will be opened on July 28. Meanwhile, we have arranged for a pre-bid meeting for the aspiring contractors on July 15, said Panzade.

Tags: Uddhav ThackeraySubhash DesaiUddhav fadnavisAurangabad municipal corporationMaharashtra congress workingBalasaheb fadnavisAMC
Open in App

Related Stories

MaharashtraMaharashtra Politics: Raj Thackeray Meets CM Devendra Fadnavis at Taj Lands End Amid Rumours of MNS–Sena UBT Alliance

MaharashtraSangli Lok Sabha Twist: Wrestler-Turned-Politician Chandrahar Patil Joins Shinde-Led Shiv Sena After Fallout with Thackeray Camp

Maharashtra‘Begani Shaadi Mein Abdullah Deewana’: Devendra Fadnavis on Uddhav Thackeray–Raj Thackeray Alliance Buzz

MaharashtraHeavy Security at Durgadi Fort Kalyan as Thackeray and Shinde Factions Hold Parallel Ghantanaad Events on Eid Al Adha 2025

MaharashtraDevendra Fadnavis Reacts to Uddhav Thackeray–Raj Thackeray Alliance Buzz, Says...

Aurangabad Realted Stories

AurangabadPolice takes assertive stand on removing encroachments for the first time

AurangabadMurder incident prompts CSMC-police to free Mukundwadi area from encroachments

AurangabadHealing through harmony: Dipak Pawar launches free music therapy sessions for mental wellness

Aurangabad14-hour water shutdown on Sunday

AurangabadTwo night robberies within hours on Beed Bypass: over Rs 6.5 lakh looted in separate attacks