City
Epaper

Electric engine trial on Ankai - Rotegaon route

By Lokmat English Desk | Updated: March 25, 2022 22:50 IST

Aurangabad, March 25:The electrification of Manmad (Ankai) - Rotegaon route has been completed while the trial of the ...

Open in App

Aurangabad, March 25:

The electrification of Manmad (Ankai) - Rotegaon route has been completed while the trial of the electric engine on this route was done on Friday. The second phase of electrification till Aurangabad will be done soon. Hence, the city passengers will get the speedy railway journey soon.

The work will get the final nod on March 26 by running a railway engine between Manmad to Rotegaon under the supervision of the Railway Safety Commissioner. The diesel engine will be replaced by an electric engine, after the complete electrification of the entire route from Manmad to Aurangabad route. The work is expected to be completed by December.

Open in App

Related Stories

EntertainmentI'll expose the truth: Apoorva Mukhija’s Ex Accuses Her of Spreading False Stories for Sympathy

NationalSafety audit of all schools ordered: Union Education Minister

NationalJharkhand: House collapses due to land subsidence in Dhanbad, earth cracks at several places

BusinessKitaab launch of book 'The Weight Loss Revolution' shares scientific strategies to combat obesity and weight loss

MumbaiMumbai Floods: Ashish Shelar Reviews Situation Amid Torrential Rains

Aurangabad Realted Stories

AurangabadBike thief held, stolen two-wheeler recovered in city

AurangabadMahadev van udyan at Ellora draws devotees

AurangabadKES president suspends Principal after release from Jail

Aurangabad144 donate blood at Jain Conference camp, flag hoisting held

AurangabadVeteran playwright & writer Prabhakar Lonikar passes away