City
Epaper

Four-laning work on Chhatrapati Sambhajinagar–Paithan highway enters final stage

By Lokmat Times Desk | Updated: October 4, 2025 22:30 IST

Chhatrapati SambhajinagarThe four-laning project on National Highway 752, connecting Chhatrapati Sambhajinagar to Paithan, has entered its final stage, ...

Open in App

Chhatrapati Sambhajinagar

The four-laning project on National Highway 752, connecting Chhatrapati Sambhajinagar to Paithan, has entered its final stage, with concrete road work currently underway near Niljagaon Phata, close to Bidkin.

To ensure safety and smooth progress, traffic will be temporarily diverted from 4 to 18 October 2025. Motorists are advised to follow alternative routes to avoid inconvenience.

Closed Route:

The stretch from Kachner – Niljagaon – Bidkin via DMIC Niljagaon Phata – Bidkin to Chhatrapati Sambhajinagar will remain closed to all vehicles.

Alternative Routes:

Vehicles traveling from Chhatrapati Sambhajinagar towards Waluj, Kachner, or Paithan, and those coming from these directions, should use the designated detours. Traffic police and local authorities have installed signboards and control measures along these routes to guide commuters. SP Dr. Vinaykumar Rathod urged travelers to strictly follow the alternative routes and traffic instructions to ensure safety during the construction period.

Open in App

Related Stories

PoliticsWest Bengal SIR: SC hands over judicial officers blockade probe to NIA, slams state officials for law and order failure

PoliticsDiversion politics to hide Amaravati corruption; MAVIGUN emerges as real growth engine: YSRCP

EntertainmentSSR’s sister Shweta says 'nobody can play Rama as beautifully as bhai', reacts to his AI images as Lord Ram

InternationalMassive US air operation saves two stranded in Iran: Trump

InternationalPanama City Bridge Fire: Four Injured, One Missing After Fuel Tanker Truck Explodes on Canal Bridge

Aurangabad Realted Stories

AurangabadUS-Iran War to Continue for Next 6 Months

AurangabadThree assault cases emerge from minor disputes

AurangabadVC to inaugurate rare books exhibition today

AurangabadCivic Chief flags concerns over incomplete hydraulic testing of 2,500-mm pipeline

AurangabadProbe into Fake Approvals of School Staff Case Launched