City
Epaper

Painting 72-km long journey of Kham River on 244-feet long wall in Cantonment

By Lokmat English Desk | Updated: May 7, 2021 23:10 IST

Aurangabad, May 7:Here is good news for Aurangabadkars as the Aurangabad Municipal Corporation (AMC), with the help of ...

Open in App

Aurangabad, May 7:

Here is good news for Aurangabadkars as the Aurangabad Municipal Corporation (AMC), with the help of its associates, has increased the speed of the task of rejuvenating and beautifying the city's pride Kham River. Today, the task of painting the 72-km long journey of the river on the 244-feet long wall (adjacent to Income Tax Bhavan-Cantonment) has been undertaken.

The AMC is being supported by the Aurangabad Cantonment Board, few social organisations, NGOs, and alert citizens in this cause of reviving the past glory of the river.

Some 400 years ago, the city was developed on the banks of the river. However, in the last 70 years, the river got transformed into a nullah filled with silt, garbage, and other waste. Hence the works to desilt the river, clean up its surroundings, and beautifying the site got started the portion close to ACB and Income Tax Bhavan, a few months ago.

The painters Abdul Rasheed, Sunderlal Kumawat, Deepak Kumawat, and Pravin Devle had started painting the 244 feet long compound wall of the Income Tax Bhavan. The design showing the journey of the river has been made by Sai Sawant. Meanwhile, to match the natural habitat, the bridge passing overhead the river has been painted along with the pipes resting in the river bed. Besides, on both sides, the work to developed landscape has been also started with the help of pebbles and boulders.

72-km long river journey

The Kham River originates from the Dudhana River Valley and merges into Harsul Tank. From here, from the rear side of the Himayat Baugh, Bibi ka Maqbara, Makai Gate, Mehmood Gate, and Barapulla Gate, it arrives at the Cantonment Board Office and further flows from Karnapura, Yesgaon in Gangapur and through merging with Godavari River culminates into Nathsagar (Jayakwadi Dam). The distance from origin till tail-end is 72 kms. Hence this journey is being painted on the wall.

Caption: An artist drawing a sketch depicting the journey of Kham River on the wall near Income Tax Bhavan in Cantonment.

Tags: Aurangabad Cantonment BoardSunderlal KumawatAbdul RasheedAurangabad municipal corporationAMCACBIncome Tax BhavanHimayat BaughCantonment Board OfficeDeepak KumawatPravin Devle
Open in App

Related Stories

MumbaiKurla Bribery Case: ACB Arrests Assistant Engineer for Taking ₹1 Lakh Bribe

MumbaiMumbai: Clerk Arrested Red-Handed for Accepting Rs 15 Lakh Bribe; Additional Sessions Judge Under Scanner

MumbaiTwo Mumbai Police Officers Dismissed After ACB Catches Them Taking Rs 2.3 Lakh Bribe

MumbaiMHADA Engineer Caught Accepting ₹40,000 Bribe in Mumbai; Demanded ₹4 Lakh to Avoid Action on Illegal Construction

MumbaiMumbai News: ACB Arrests Two Wadala TT Police Officials in Bribery Case

Aurangabad Realted Stories

AurangabadFake ‘PMO Secretary’ arrested at Wedding; Police expose impersonator

AurangabadCMIA delegation meets CM Fadnavis; raises key industrial issues

Aurangabadtest test

AurangabadATDF pushes Pune–Chhatrapati Sambhajinagar air connectivity; proposal sent to AOC

AurangabadLast day for B Pharm admissions today