City
Epaper

Registration for coaching at Pre-IAS Centre begins

By Lokmat English Desk | Updated: August 20, 2023 22:50 IST

Chhatrapati Sambhajinagar: The Pre-IAS and NET-SET Coaching Centre of Dr Babsaheb Ambedkar Marathwada Univeristy started registration for the coaching ...

Open in App

Chhatrapati Sambhajinagar: The Pre-IAS and NET-SET Coaching Centre of Dr Babsaheb Ambedkar Marathwada Univeristy started registration for the coaching of the UPSC preliminary examination. The candidates belonging to Scheduled Caste, Scheduled Tribe, Other Backward Class and Minorities will get coaching at the centre for UPSC Civil Services Examination (Prelims)-June 2023. The aspirants register up to August 25 while the coaching classes will commence on September 6 and end on June 30, 2024. The registration fee is Rs 200.

Centre director Dr Sadiq Bagwan said that the selected students would not get a hostel facility nor any honorarium. For details, one may visit the portal of the university.

Tags: congresspitrodadelhimodideepikabjpwest-bengaldeepika-padukoneajay-devgnthakur
Open in App

Related Stories

NationalAir India Delhi–Mumbai Flight Returns After Engine Shutdown; Aviation Ministry Seeks Detailed Report

Maharashtra‘Maharashtra Stands Firmly With Development’: PM Modi on BJP-Led Mahayuti’s Civic Poll Win

MaharashtraAmit Shah Congratulates Mahayuti Leaders on Big Win in Maharashtra Local Body Polls

MaharashtraMaharashtra Local Body Election Results 2025: “Such a Victory Has Not Been Seen in Last 30–35 Years,” Says Devendra Fadnavis

Mumbai‘Rickshaw Was at Full Speed’: BJP MLA Parag Shah Explains Viral Video of Him Slapping Auto Driver in Ghatkopar

Aurangabad Realted Stories

AurangabadStepping Stones Jungle Book comes to life

AurangabadBlind women cricketers’ World Cup triumph celebrated; From impossible to possible: Indian eves achieve extraordinary feat

AurangabadInterviews for candidates by Uddhav Sena Today

AurangabadBurglars break into businessman’s flat, steal jewellery

AurangabadAccess to satara-bound station delayed; work crawls ahead