City
Epaper

Remove hurdles to expedite land acquisition process: Kendrekar

By Lokmat English Desk | Updated: January 3, 2021 23:10 IST

Aurangabad, Jan 3: The road construction works in Marathwada throughPublic Works Department (PWD), National Highway Authority of India ...

Open in App

Aurangabad, Jan 3: The road construction works in Marathwada through

Public Works Department (PWD), National Highway Authority of India (NHAI) and Maharashtra State Road Development Corporation (MSRDC) are going on fast

pace.

Divisional commissioner Sunil Kendrekar took a review meeting of road works and pending cases of land acquisition. He instructed the revenue machinery to dispose of the pending land acquisition cases and remove hurdles of road constructions.

The process of land measurement is underway at some places. A network of roads being developed through three chief machineries PWD, NHAI and MSRDC.

The highest number of roads are being constructed in Nanded district. The land would be acquired for roads- Ardhapure to Himayatnagar (64 km), Barasgaon Rahati (52 km), Bhokar to Sarsam (32 km), in Nanded. The roads from Sarsam to Kothari (57 km), Kothari to Dhanoda (56.8 km), Usmannagar to Kundral (52 km), Kundral to Vazar (46.52 km), and Nanded to Jalkot (65.95 km) will be constructed.

In Osmanabad, the 39.82 km road between Naldurga to Akkalkot will be developed, while in Latur, it will be Renapur Phata to Pangaon (20.2 km), Latur to Renapur Phata (21.75 km), Jalkot to Tongri (45.55 km). The officers were instructed to expedite the land acquisition process for completing the road works on time.

Deputy commissioner Pandurang Kulkarni, PWD chief engineer Dilip Ukirde, Salunke from MSRDC, project director of NHAI Ajay Gadekar were present.

*A’bad-Sillod-Fardapur road to be completed*

A total of 11.20 km road will be developed between Aurangabad to Sillod and Paithan-Shiroor, 32 km road from Sillod to Fardapur. A 88 km long road will be developed from Bhokardan to Hasnabad in Jalna. The PWD will construct a road between Shiroor and Paithan in Beed, Shiroor to Kharda (42.5 km), Lokhandi Sawargaon to Renapur Phata (38.27 km), Kharwandi to Rajuri (6.30 km).

Open in App

Related Stories

InternationalTrustees' Board renames John F Kennedy Center to Trump-Kennedy Center

InternationalMoS Anupriya Patel holds bilateral health talks with Sri Lanka, Fiji at 2nd WHO Traditional Medicine Summit

InternationalUkraine's "resilience" can weaken Putin's ability to prolong war: Zelenskyy

Other SportsVenkatesh Iyer to lead Madhya Pradesh in Vijay Hazare Trophy in Ahmedabad

EntertainmentMrunal Thakur says ‘Dacoit’ is her first film shot in 2 languages

Aurangabad Realted Stories

AurangabadFormer corporator assaulted due to misunderstanding; accident caused by car driver

AurangabadAghori Pooja performed at doorstep of Uddhav Sena candidate

AurangabadFriend framed minor in fake gold smuggling case; trio posed as police, extorted 37 grams of gold

AurangabadNCP demands 35 seats from BJP

Aurangabad‘Sachkhand’ delayed by five hours