City
Epaper

Shivajinagar underpass flooded after rain, citizens slam official negligence

By Lokmat English Desk | Updated: May 18, 2025 20:05 IST

Chhatrapati SambhajinagarThe season’s first unseasonal rainfall on Sunday afternoon exposed serious flaws in the newly constructed Shivajinagar underpass, ...

Open in App

Chhatrapati Sambhajinagar

The season’s first unseasonal rainfall on Sunday afternoon exposed serious flaws in the newly constructed Shivajinagar underpass, which was left completely submerged causing traffic disruption and public outrage.

The underpass, which connects Satara-Deolai to Jhalta and the old city, was flooded within minutes, with water levels rising high enough to submerge two-wheelers. Several commuters attempted to cross but got stranded as vehicles stalled mid-way.

What went wrong?

• Improper gradient design; outlets were constructed above road level, especially on the western side.

• Drainage outlet on the Shivajinagar end is undersized and poorly aligned.

• External outlet blocked due to thermocol debris and soil accumulation.

• Water was redirected to a nearby drain that is partially encroached by locals.

• Lack of coordination among the World Bank Project team, Railway Department, and Municipal Corporation.

Despite heavy traffic snarls on alternate routes like Shahnoormiyan Dargah flyover, no water-pumping efforts were undertaken. The underpass remained waterlogged until late night. Police later barricaded entry from Deolai Chowk to prevent mishaps.

Citizens Outraged

Locals, who once celebrated the launch of the underpass, now accuse authorities of negligence.

“Our repeated warnings were ignored. Now the public is paying the price,” said a local resident.

Railways Under Fire

The officials revealed that the Railway Department ignored multiple written requests from World Bank, Muncipal Corporation project engineers regarding outlet corrections. The outlet was built over a foot higher than road level, violating basic engineering norms. “The department’s oversight has put lakhs of commuters at risk. Until the error is rectified, citizens will continue to suffer,” an official stated. This incident has once again highlighted the glaring loopholes in the city’s urban infrastructure planning and inter-departmental coordination.

Open in App

Related Stories

Other SportsLSG’s lower-order batting remains a concern as it hasn't been fully addressed, says Chopra

NationalKerala govt to introduce permanent nativity card: CM Vijayan

TechnologyDigital push speeds up consumer justice, Rs 42.6 crore refunds facilitated: Pralhad Joshi

EntertainmentFisayo Akinade was shocked to receive a casting call from Kate Winslet

BusinessCentre rolls out next-gen reforms to strengthen India’s quality ecosystem

Aurangabad Realted Stories

AurangabadForeign experts inspect Kham River rejuvenation work

AurangabadArrival & departure of 'Sachkhand Express delayed

AurangabadBJP-Shinde Sena blames each other for delay in resolving seat sharing issue

Aurangabad2 create ruckus with swords & attempt to burn vehicles

AurangabadClerk demanded bribe to reduce professional tax from Rs 3 lakh to Rs 20,000