City
Epaper

Shivajinagar underpass flooded after rain, citizens slam official negligence

By Lokmat English Desk | Updated: May 18, 2025 20:05 IST

Chhatrapati SambhajinagarThe season’s first unseasonal rainfall on Sunday afternoon exposed serious flaws in the newly constructed Shivajinagar underpass, ...

Open in App

Chhatrapati Sambhajinagar

The season’s first unseasonal rainfall on Sunday afternoon exposed serious flaws in the newly constructed Shivajinagar underpass, which was left completely submerged causing traffic disruption and public outrage.

The underpass, which connects Satara-Deolai to Jhalta and the old city, was flooded within minutes, with water levels rising high enough to submerge two-wheelers. Several commuters attempted to cross but got stranded as vehicles stalled mid-way.

What went wrong?

• Improper gradient design; outlets were constructed above road level, especially on the western side.

• Drainage outlet on the Shivajinagar end is undersized and poorly aligned.

• External outlet blocked due to thermocol debris and soil accumulation.

• Water was redirected to a nearby drain that is partially encroached by locals.

• Lack of coordination among the World Bank Project team, Railway Department, and Municipal Corporation.

Despite heavy traffic snarls on alternate routes like Shahnoormiyan Dargah flyover, no water-pumping efforts were undertaken. The underpass remained waterlogged until late night. Police later barricaded entry from Deolai Chowk to prevent mishaps.

Citizens Outraged

Locals, who once celebrated the launch of the underpass, now accuse authorities of negligence.

“Our repeated warnings were ignored. Now the public is paying the price,” said a local resident.

Railways Under Fire

The officials revealed that the Railway Department ignored multiple written requests from World Bank, Muncipal Corporation project engineers regarding outlet corrections. The outlet was built over a foot higher than road level, violating basic engineering norms. “The department’s oversight has put lakhs of commuters at risk. Until the error is rectified, citizens will continue to suffer,” an official stated. This incident has once again highlighted the glaring loopholes in the city’s urban infrastructure planning and inter-departmental coordination.

Open in App

Related Stories

InternationalUS President Trump "saddened" by Joe Biden's prostate cancer diagnosis

International"Joe is a fighter": Kamala Harris expresses support for Joe Biden's prostate cancer diagnosis

International"Response to deliberate trade disruptions": Ex-High Commissioner Sikri on India's trade restrictions with Bangladesh

International"High time for India to be strict": Foreign Affairs Expert on India's trade restrictions to Bangladesh

InternationalFormer US President Biden diagnosed with "aggressive form" of prostate cancer

Aurangabad Realted Stories

AurangabadSt Lawrence School students excel in SSC exam 2025

Aurangabad(Photo caption) 3-vehicle collision on Beed Bypass Flyover causes injuries

AurangabadGang arrested for stealing passengers’ valuables at bus station

AurangabadCouple injured in high-speed car collision

AurangabadGang arrested for stealing passengers’ valuables at bus station