City
Epaper

Water storage in jayakwadi dam reaches 86%

By Lokmat English Desk | Updated: July 28, 2025 23:50 IST

Chhatrapati SambhajinagarDue to heavy rainfall in the catchment area of the Jayakwadi dam and increased inflow from upstream ...

Open in App

Chhatrapati Sambhajinagar

Due to heavy rainfall in the catchment area of the Jayakwadi dam and increased inflow from upstream reservoirs, the water level of the dam reached 85.93% by 6 pm on Monday.

Water is entering the dam at a rate of 31,896 cusecs. A large volume of water is flowing into Jayakwadi dam, and by 6 pm on Monday, the water level had reached 1,519.25 feet. The total water storage stood at 2,594.867 TMC (thousand million cubic feet), with live storage at 1,856.761 TMC. The total capacity has reached 85.93%. If the inflow continues overnight, the storage may cross 90%, which may necessitate the opening of the dam gates to release water into the Godavari river. On this same day last year, the storage was only 6.26%. Water discharge from the dam’s left canal was stopped on Sunday, while 1,100 cusecs are being released through the right canal towards Majalgaon dam, according to dam engineer Mangesh Shelare.

Open in App

Related Stories

TechnologyBoeing reports net loss of $612 million in Q2 2025

Other SportsIPL 2026: KKR and head coach Chandrakant Pandit part ways after three seasons

BusinessBoeing reports net loss of $612 million in Q2 2025

NationalMP: Speaker expresses disappointment on direct answers not being provided in the House

International"Thank you for making this journey unforgettable": US Consul General Jennifer Larson bids farewell to Hyderabad

Aurangabad Realted Stories

AurangabadCyclists participate in trekking Gogababa to Daulatabad Fort

AurangabadPay your property tax through e-wallet

Aurangabad200 participate in campus placement drive

AurangabadA bond forged in 1974 still unbroken in 2025

AurangabadA collective responsibility