City
Epaper

Water supply to be interrupted for 4 days in MIDC

By Lokmat English Desk | Updated: October 13, 2022 19:15 IST

Lokmat News NetworkAurangabad, Oct 13:Maharashtra Industrial Development Corporation (MIDC) has started the work of replacing the old ...

Open in App

Lokmat News Network

Aurangabad, Oct 13:

Maharashtra Industrial Development Corporation (MIDC) has started the work of replacing the old water pipeline with 700 mm diameter pipes. During this work, the water supply to the Chikalthana and Aurangabad MIDC areas will be interrupted between October 14 and 17 affecting around 1,400 industries.

Executive engineer Rameshchandra Giri said MIDC provides water to the old Aurangabad MIDC in the Railway Station area and Chikalthana MIDC area. Now, the work to replace around 21 km old pipeline from the water treatment plant at Waluj to Chikalthana MIDC with a 700 mm diameter pipeline has been initiated. Until now, the work of around 14 kms has been completed up to Kamalnayan Bajaj Hospital. The further work will be continued from October 14 to 17 due to which the water supply to Aurangabad and Chikalthana MIDC areas will be closed, Giri said.

There are 163 big and 1,141 small industries in Chikalthana and 96 in Aurangabad MIDC which will be affected due to the interrupted water supply.

Tags: Lokmat news network aurangabadRameshchandra GiriMaharashtra industrial development corporationIndustrial development corporationLokmat News NetworkMidcKamalnayan Bajaj HospitalGiri
Open in App

Related Stories

MaharashtraPalghar: Gas Leak in Tarapur MIDC Leaves 19 Workers Hospitalised: Report.

MumbaiMumbai: Employees Arrested for Stealing 100 Grams of Gold Jewellery Worth ₹14.75 Lakh from Andheri Firm

MumbaiMumbai: Man Attacks Wife, Minor Son with Sickle After Mobile Phone Dispute in Andheri; Arrested

MumbaiPune Travel Agent Arrested for Cheating Doctor, Friends of ₹8.25 Lakh Over Vietnam Visa

NationalNavi Mumbai Fire: Massive Blaze Erupts at Chemical Factory in MIDC Pawane Area (VIDEO)

Aurangabad Realted Stories

AurangabadShinde Sena’s insistence on ZP chief role backfires

AurangabadAastha Foundation to receive Amar Urja Award 2025

AurangabadModified UDAN scheme brings new hope for Marathwada air connectivity

AurangabadMerge Surplus Teachers or Stop Their Salaries: Education Dept Orders

AurangabadOld vehicle owners to pay double environmental tax