City
Epaper

Azure Power refinances its 600 MWs ISTS connected solar project at the lowest rate of interest in its portfolio to date

By ANI | Updated: February 22, 2022 18:40 IST

Azure Power, a leading independent sustainable energy solutions provider and power producer in India, today announced successful refinancing of its existing project finance facility of INR 23.50 billion (~USD 313 million) utilized towards construction of its largest project - 600 MWs Interstate Transmission System (ISTS) connected solar project implemented by Azure Power Forty Three Pvt Ltd, a Special Purpose Vehicle (SPV).

Open in App

Azure Power, a leading independent sustainable energy solutions provider and power producer in India, today announced successful refinancing of its existing project finance facility of INR 23.50 billion (~USD 313 million) utilized towards construction of its largest project - 600 MWs Interstate Transmission System (ISTS) connected solar project implemented by Azure Power Forty Three Pvt Ltd, a Special Purpose Vehicle (SPV).

The project was fully commissioned recently in December 2021.

The refinancing has been completed at a rate of interest of 7.2% per annum, which is fixed for 42 months and the lowest rate of interest for any project finance facility in terms of rupee financing for the company's existing portfolio so far.

"Refinancing the original term loan was one of our highest priorities, even before the project was fully commissioned in December 2021. The facility will result in substantial savings in interest cost and will improve the project IRR significantly. We are overwhelmed with the response we get from the credit markets which basically reflects lenders' confidence in our strong corporate governance standards, operational capabilities, and credit fundamentals," said Pawan Kumar Agrawal, Chief Financial Officer, Azure Power.

L&T Finance Limited has acted as the sole underwriter for this refinancing facility.

This is the largest solar power project in India, owned and operated at a single location by any developer. The project is 600 MWs (897 MWp) Interstate Transmission System (ISTS) connected solar project in Bikaner, Rajasthan, allocated by Solar Energy Corporation of India (SECI). The power generated from the project is being supplied to SECI at a tariff of INR 2.53 (~US 3.5 cents) per kWh under the Power Purchase Agreement executed with SECI for 25 years. The project was commissioned in multiple phases, with the last 100 MWs commissioned in December 2021.

Azure Power is a leading independent sustainable energy solutions provider, and power producer in India on a mission to create value for all stakeholders through high-performance Renewable Energy assets to displace 230 million tons of global emissions by 2030.

We developed India's first utility scale solar project in 2009 and since then, Azure Power has grown rapidly to become a leader in developing and operating renewable energy projects in the country. We have substantially reduced our total project cost, which includes a significant reduction in balance of systems costs due in part to our value engineering, design, and procurement efforts.

For more information about us, visit:

This story is provided by PRNewswire.will not be responsible in any way for the content of this article. (ANI/PRNewswire)

( With inputs from ANI )

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: Azure PowerAzure power forty three pvt ltdindiaBikanerIndiUk-indiaRepublic of indiaPawan kumar agrawalIndia indiaAzure power solar energy pvt ltdAzure power global ltdGia india
Open in App

Related Stories

CricketIndia vs South Africa 2025 Schedule: Full List of Matches, Dates, Venues and Fixtures

TechnologyOpenAI Offers ChatGPT Go Free for a Year in India; Check All the Features Users Can Now Access

NationalGolden Power: Indian Women Now Hold 24,000 Tonnes of Gold, Outshining Global Investors

MumbaiMumbai Man Pursuing PhD in US Booked for Sexually Abusing Woman on False Promise of Marriage

LifestyleCreative Rangoli Designs for Dhanteras and Diwali 2025 to Welcome Goddess Lakshmi

Business Realted Stories

BusinessRBI measures to provide liquidity relief to exporters, ride out near-term pressure

Business"All possibilities are on table": Piyush Goyal expresses optimism on India-Canada FTA

BusinessHVAX Technologies Reports 35 Percent Jump in Total Income for H1 FY26

BusinessMerck Foundation Mark World Diabetes Day 2025 by Providing 925 Scholarships for Future Diabetes, Endocrinology, Cardiovascular Preventive, and Cardiology Experts from 52 Countries

Business'Diabetes Ko Blue Banayein': S.L. Raheja Hospital Mobilises Mumbai with a Multi-Touchpoint Diabetes Awareness Initiative