City
Epaper

Azure Power refinances its 600 MWs ISTS connected solar project at the lowest rate of interest in its portfolio to date

By ANI | Updated: February 22, 2022 18:40 IST

Azure Power, a leading independent sustainable energy solutions provider and power producer in India, today announced successful refinancing of its existing project finance facility of INR 23.50 billion (~USD 313 million) utilized towards construction of its largest project - 600 MWs Interstate Transmission System (ISTS) connected solar project implemented by Azure Power Forty Three Pvt Ltd, a Special Purpose Vehicle (SPV).

Open in App

Azure Power, a leading independent sustainable energy solutions provider and power producer in India, today announced successful refinancing of its existing project finance facility of INR 23.50 billion (~USD 313 million) utilized towards construction of its largest project - 600 MWs Interstate Transmission System (ISTS) connected solar project implemented by Azure Power Forty Three Pvt Ltd, a Special Purpose Vehicle (SPV).

The project was fully commissioned recently in December 2021.

The refinancing has been completed at a rate of interest of 7.2% per annum, which is fixed for 42 months and the lowest rate of interest for any project finance facility in terms of rupee financing for the company's existing portfolio so far.

"Refinancing the original term loan was one of our highest priorities, even before the project was fully commissioned in December 2021. The facility will result in substantial savings in interest cost and will improve the project IRR significantly. We are overwhelmed with the response we get from the credit markets which basically reflects lenders' confidence in our strong corporate governance standards, operational capabilities, and credit fundamentals," said Pawan Kumar Agrawal, Chief Financial Officer, Azure Power.

L&T Finance Limited has acted as the sole underwriter for this refinancing facility.

This is the largest solar power project in India, owned and operated at a single location by any developer. The project is 600 MWs (897 MWp) Interstate Transmission System (ISTS) connected solar project in Bikaner, Rajasthan, allocated by Solar Energy Corporation of India (SECI). The power generated from the project is being supplied to SECI at a tariff of INR 2.53 (~US 3.5 cents) per kWh under the Power Purchase Agreement executed with SECI for 25 years. The project was commissioned in multiple phases, with the last 100 MWs commissioned in December 2021.

Azure Power is a leading independent sustainable energy solutions provider, and power producer in India on a mission to create value for all stakeholders through high-performance Renewable Energy assets to displace 230 million tons of global emissions by 2030.

We developed India's first utility scale solar project in 2009 and since then, Azure Power has grown rapidly to become a leader in developing and operating renewable energy projects in the country. We have substantially reduced our total project cost, which includes a significant reduction in balance of systems costs due in part to our value engineering, design, and procurement efforts.

For more information about us, visit:

This story is provided by PRNewswire.will not be responsible in any way for the content of this article. (ANI/PRNewswire)

( With inputs from ANI )

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: Azure PowerAzure power forty three pvt ltdindiaBikanerIndiUk-indiaRepublic of indiaPawan kumar agrawalIndia indiaAzure power solar energy pvt ltdAzure power global ltdGia india
Open in App

Related Stories

NationalOperation Sindhu: “We Saw Drones, Missiles,” Say Evacuated Students Recounting Life in Iran’s Warzone

NationalCOVID-19 Update: Mumbai Cases Drop Sharply; India’s Active Tally Drops By 428

CricketIndia vs India A Intra-Squad LIVE Streaming: When and Where To Watch Intra-Squad Match on TV and Online?

Navi MumbaiNavi Mumbai News: Border Crackdown Forces Indian Woman to Part With Children and Husband Amid Citizenship Chaos

NationalAir India Plane Crash in Gujarat: Could This Be One of India’s Deadliest Air Disasters? Here Are Top 5 Worst Aviation Tragedies

Business Realted Stories

BusinessAir India flights to be hit from June 21 to July 15 due to Boeing checks

BusinessRBI eases final project finance rules, lowers provisioning norms for banks

BusinessRBI issues final guidelines on project finance; new norms effective from October 1

BusinessPiyush Goyal showcases India's strategic economic vision at India Global Forum 2025 in London

BusinessGovt says no decision yet on sending black boxes of Air India’s crashed plane abroad for decoding