City
Epaper

KP Group’s Remarkable Achievement, Seven Windmills Simultaneously Installed in South Gujarat

By PNN | Updated: May 13, 2023 12:00 IST

KP Group Sets Record with Simultaneous Installation of Seven Windmills in South GujaratSurat (Gujarat) [India], May 13: KPI ...

Open in App

KP Group Sets Record with Simultaneous Installation of Seven Windmills in South Gujarat

Surat (Gujarat) [India], May 13: KPI Green Energy Limited (NSE – BSE listed), the flagship company of the KP Group, a pioneering force in India’s renewable sector, has made history with the installation and commissioning of wind turbines under the Hybrid Policy in South Gujarat.

This accomplishment is backed by the scientific approach of visionary Mr Faruk G. Patel, Chairman and Managing Director of the company. The group successfully installed seven wind turbines and their solar portion at various villages in Kora village, Bharuch district.

Mr Faruk G. Patel acknowledged the business-friendly renewable energy policy of the Government of Gujarat, which facilitated the project’s smooth execution and also expressed his gratitude to the stakeholders like Suzlon and Senvion for their prompt provision of turbines. He expressed special thanks to Mr Bakul Limbasia, Promoter-Nouveau Jewellery LLP (India’s leader in lab-grown diamonds), for first trusting and investing in his vision.

It is worth noting that until now, the most feasible locations for wind turbines in terms of wind projects were believed to be Bhavnagar, Porbandar and Kutch regions. However, KP Group’s astute venture has opened new horizons in the southern part of Gujarat for wind energy.

Mr Patel emphasized that this achievement is a matter of pride for all involved, as it opens new doors for wind energy in the South Gujarat region. This initiative will majorly contribute towards the target of 500 GW under renewable energy as envisaged by our honourable Prime Minister Shri Narendrabhai Modi.

The project includes two turbines installed for Nouveau Jewellery LLP, Green Lab Diamonds, and Mono Steel under the CPP model and one turbine for KPI Green Energy Ltd. under the IPP model. KP Group looks forward to installing many more projects in the South Gujarat region, which will be a key driver in achieving Mr Patel’s ambitious target of 2 Gigawatt of commissioned energy by 2025.

https://youtu.be/WVxL0itBSUU

If you have any objection to this press release content, kindly contact pr.error.rectification@gmail.com to notify us. We will respond and rectify the situation in the next 24 hours.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: Kp group sets recordSimultaneous installation of seven windmillsShri narendrabhai modiSuratSurat AirportSurat rural policeBharuchSurat nagarSurat joint commissioner of policeDahej industrial estate of bharuchSurat jewellery associationSurat nagar palika sikshan samiti
Open in App

Related Stories

NationalGujarat Fire: Massive Blaze Erupts At Bharuch Industrial Unit, 15 Fire Engines Deployed (Watch Video)

NationalSurat Horror: Toddler Run Over by School Van, Saved After Timely Rescue, Disturbing Video Surfaces

NationalSurat Horror: Woman Pushes 2-Year-Old Son From 13th Floor, Then Jumps to Death

NationalSurat Fire: 2 Workers Killed, Over 20 Injured As Blast Triggers Blaze at Textile Unit in Gujarat (VIDEO)

NationalSurat Tragedy: Three of Family Die in Sleep After Inhaling Smoke From Generator in Bhatha

Business Realted Stories

BusinessDriven by rising data traffic and use of AI, India's data centre capacity to rise 5x by 2030: Jefferies

BusinessSunil Bharti Mittal lauds PM Modi’s forward-thinking, technology-first approach

BusinessIdentifying the road ahead for India-US trade talks

BusinessIndia’s maritime sector set to attract Rs 80 lakh crore investment, create 1.5 crore jobs: Sonowal

BusinessGlobal chip design giants coming to India as talent pipeline strengthens: Vaishnaw