City
Epaper

Patel Engineering Ltd. Along With It’s Joint Venture Partners Have Been Declared Lowest (L1) For New Orders Aggregating Rs. 1,5676.24 Mn., Our Share 10,090.56 Mn

By PNN | Updated: February 15, 2023 11:45 IST

Mumbai (Maharashtra) [India], February 15: Patel Engineering Limited, a civil construction Company specializing in the hydropower and irrigation sector, today ...

Open in App

Mumbai (Maharashtra) [India], February 15Patel Engineering Limited, a civil construction Company specializing in the hydropower and irrigation sector, today announced that they have been declared the lowest bidder (L1) for the below-mentioned projects. These projects will be executed in Joint Ventures. All the Projects are scheduled to be completed in 36 months.

Sr.No.ProjectsDescriptionCompany’s  Share in the Project (Rs. In million) 
1Rihand Micro Irrigation Project by Department of Water Resources, Madhya Pradesh.Construction of a Pressure irrigation system to supply water through the Rising/ Gravity mains by pressurized pipeline system for micro-irrigation under Rihand Micro Irrigation Project, State of Madhya Pradesh5,120.47
2Krishna Marathwada Irrigation Project – Lift Irrigation Scheme 01 – 

By Water Resources Department, Government of Maharashtra

The investigation, design, construction, testing, and commissioning of works comprising of civil and allied works under lift irrigation scheme no.1 of Krishna Marathwada Irrigation Project, Dist. Osmanabad, State Maharashtra3,373.34
3Krishna Marathwada Irrigation Project – Lift Irrigation Scheme 02 – 

By Water Resources Department, Government of Maharashtra

Investigation, design, construction, testing, commissioning of works comprising of civil and allied works under lift irrigation scheme no.2 of Krishna Marathwada Irrigation Project, Dist. Osmanabad, State Maharashtra1,596.75
Total 10,090.56

About Patel Engineering Limited:

Patel Engineering Limited. (‘PEL’ or ‘Company’), is a 73-year company established in the year 1949 having a strong presence in tunnels and underground works for hydroelectric and dam projects? The Company has a consistent track record in the execution of projects in the domestic and international arenas. The Company has completed over 85 dams, 40 hydroelectric projects and more than 300 km of tunneling for clients which are mostly central PSUs or state government organizations.

If you have any objection to this press release content, kindly contact pr.error.rectification[at]gmail.com to notify us. We will respond and rectify the situation in the next 24 hours.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: Patel Engineering Ltd.indiamumbaiIndiUk-indiaRepublic of indiaIndia indiaJoint venturesGia indiaIndia euSouthwest bay of bengal
Open in App

Related Stories

MumbaiMumbai Traffic Update: Police Issue Advisory for Shiv Sena UBT Dussehra Rally On October 2; Check Diversions

MumbaiMumbai: FIR Filed Over Maharashtra Congress’ Social Media Post Allegedly Inciting Violence

MumbaiMumbai: MNS Workers Protest at Andheri Metro Station, Damage Billboard, Demand Only Marathi Ads

MumbaiMumbai: Bomb Threat at Dadar Railway Station; Police Launch Investigation

MaharashtraMaharashtra Rains: Holiday Declared in All Schools in Palghar on September 29 Due to Heavy Rains

Business Realted Stories

BusinessIndia set for 6.5 pc average growth over next decade: Morgan Stanley

BusinessTaiwan Tourism Deepens Engagement in Australia & New Zealand

BusinessThe Rising Influence of Essential Oils Across Various Industries

BusinessSAS Partners with S-VYASA University to Launch Future-ready AI and Data Analytics Programs

BusinessBeOndHub Studios Launches Across India as an AI-Native Creative Powerhouse