City
Epaper

Quality, rapid work for Mumbai-Ahmedabad HSR reflects strong India-Japan partnership: Minister

By IANS | Updated: October 3, 2025 19:30 IST

New Delhi, Oct 3 Union Minister Ashwini Vaishnaw on Friday said that the quality standards and rapid pace ...

Open in App

New Delhi, Oct 3 Union Minister Ashwini Vaishnaw on Friday said that the quality standards and rapid pace of work for the under-construction Mumbai-Ahmedabad High-Speed Rail project reflect the strong partnership between India and Japan.

The minister, in a post on X, informed that he visited the High Speed Rail (HSR) site in Surat with Hiromasa Nakano, the Minister of Land, Infrastructure, Transport and Tourism of Japan.

"Visited the Surat HSR site with H.E. @Hiro_NAKANO_today. Witnessed track slab laying and adjustment facility," the minister posted.

"The quality standards and rapid pace of work reflect the strong Bharat–Japan partnership," he added.

Post the site inspection, Vaishnaw and Nakano boarded a Vande Bharat train for Mumbai.

"Travelling with H.E. @Hiro_NAKANO_aboard Vande Bharat Express from Surat to Mumbai," the minister said in a separate post.

The Union Minister for Railways had earlier visited the Surat High Speed Rail Station to review the ongoing construction work and said that work on the Surat–Bilimora section was progressing at a rapid pace.

The civil work at the station had already been completed, while finishing and utility installations were underway, the minister informed.

Sharing details about the project, the Union Minister said that modern and innovative technology was being employed.

During his visit, he highlighted that the track work was advancing swiftly, and the first turnout had been successfully installed at Surat station.

He further noted that the tracks are equipped with roller bearings, ensuring greater safety and smoother running of the bullet train at high speeds.

The Union Minister also stated that the project will cut travel time between Surat and Mumbai to just one hour.

He added that the high-speed rail project will transform connectivity, stimulate economic activity, and turn the Ahmedabad–Mumbai stretch into a vital economic corridor.

The project, he said, will also set new benchmarks in railway technology and redefine the passenger experience.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Open in App

Related Stories

International"Airstrikes would be one of the many": White House says Trump keeping 'all options on table' for Iran amid protests

International"India-Germany friendship finds inspiration in shared values of sustainability": MEA

EntertainmentMark Ruffalo attacks President Trump: Worst human being

InternationalAfghan Embassy Charge d'Affaires Noor Ahmad Noor meets MEA Joint Secretary in New Delhi

BusinessAir India takes delivery of first line-fit Boeing 787-9 at IGI Airport

Business Realted Stories

BusinessVibrant Gujarat: Reverse buyers-sellers meet generates export inquiries worth Rs 500 crore

BusinessTripura exports 15,000 scented lemons to Kolkata; organic farming crosses 20,000 hectares

BusinessRBI endorsement proves Assam’s strong fiscal health: CM Sarma

BusinessPM Modi urges German companies to make full use of India’s talent

BusinessGujarat CM holds talks with German business delegation in Gandhinagar