City
Epaper

Debris removal at crippled Fukushima power plant resumes

By IANS | Updated: September 10, 2024 11:30 IST

Tokyo, Sep 10 The operator of the crippled Fukushima Daiichi Nuclear Power Plant restarted the extraction of melted ...

Open in App

Tokyo, Sep 10 The operator of the crippled Fukushima Daiichi Nuclear Power Plant restarted the extraction of melted fuel debris on Tuesday after the initial operation was suspended over a procedure failure last month.

Tokyo Electric Power Company Holdings (TEPCO) on Tuesday morning resumed efforts to extract a small amount of melted fuel debris from the No. 2 reactor, about a few grams or the size of a small spoonful, after confirming that five pipes to be used to insert a device resembling a fishing rod into the reactor's containment vessel were installed properly.

The operation, originally scheduled to begin on August 22, was halted as officials from both TEPCO and contractor Mitsubishi Heavy Industries failed to verify the correct sequence of the pipe setup, Xinhua news agency reported.

Fukushima Governor Masao Uchibori voiced concerns during a press conference on Monday, urging TEPCO to establish a robust oversight framework and not rely entirely on subcontractors, according to local media reports.

TEPCO is currently in the decades-long process of decommissioning the power plant, which suffered core meltdowns that released radiation after being hit by a 9.0-magnitude earthquake and an ensuing tsunami on March 11, 2011, resulting in a level-7 nuclear accident, the highest on the International Nuclear and Radiological Event Scale.

An estimated 880 tons of fuel debris remain in No. 1, 2, and 3 nuclear reactors stricken during the accident. The experimental removal of the deadly debris was initially planned for 2021 but was postponed three times due to the coronavirus pandemic and technical difficulties.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Open in App

Related Stories

InternationalSouth Korea urges peaceful resolution to Cambodia-Thailand clashes

AurangabadRegistration process for Research Students' Hostel begins

NationalKumaraswamy urges Union Minister Vaishnaw to launch Vande Bharat train between Bengaluru & coastal districts in K'taka

AurangabadFox rescued after falling into well

InternationalRussia develops new wear-resistant material for energy, aviation

International Realted Stories

InternationalSharjah Festival of African Literature to open January 14

InternationalEAM Jaishankar holds talks with SL Tamil leaders on Cyclone Ditwah's proposed relief package by India

InternationalChinese court sentences Tibetan activist Tsering Tso to one year in prison, suspends term

InternationalJaishankar lauds Indian business community's relief contributions in SL on face of Cyclone Ditwah

International"Common Bangladeshis not anti-India; fundamentalists whipping up hostility": Bangladeshi actor Rokeya Prachy