City
Epaper

Pakistan: Karachi residents grapple with 12-hour power outages due to illegal electricity sales, infrastructure issues

By ANI | Updated: September 7, 2024 13:00 IST

Karachi [Pakistan], September 7 : The miseries of the Karachi residents have been exacerbated by the prolonged power outages ...

Open in App

Karachi [Pakistan], September 7 : The miseries of the Karachi residents have been exacerbated by the prolonged power outages and electricity theft in the region, Pakistan-based The Express Tribune reported.

Extended power outages and electricity theft in nearby areas have worsened the hardships faced by residents of North Karachi. Many are complaining that they have to face around 12 hours of power cuts.

Residents namely; Muhammad Tariq, Farooq Khan, and Babar, noted that power cuts occur from 7:00 am to 8:30 am, 9:30 am to 12:00 pm, 2:30 pm to 5:00 pm, and from 7:00 pm to 10:30 pm. Additionally, there are many occasional power suspensions from 8:00 am to 10:00 pm.

Most residents in these areas happen to be labourers. They had to suffer a lot when they return home after a long day, and encounter power outages in the sweltering heat.

When electricity is restored at 1:30 am, they struggle to fill their water supply and go to bed around 4:00 am to 5:00 am. This disruption severely impacts their work the next day. Additionally, the school children also incur difficulty in completing their homework.

The unscrupulous elements in the power utility have allowed illegal sale of electricity through cables running from the North Karachi Industrial Area to nearby slums. There is no loadsheding in the industrial zone, according to The Express Tribune.

The "criminal elements" supply electricity to over 250 homes using illegal connections, known as "kunda." They charge an upfront fee of PKR 10,000 in advance and PKR 3,000 per month for each house.

Notably, Karachi has faced several problems regarding electricity supply to the city. As the demand increases and the existing infrastructure struggles to support the demand, there continue to be issues with the generation, transmission, and distribution of electricity.

Karachi Electric (KE) is the main electricity utility in the area, but the electricity sector has been plagued by several issues: ageing infrastructure, insufficient finances, and sometimes poor management of the utility.

Although steps have been made to mitigate the issues: financing new electrical facilities, implementing new regulations, etc., these steps more often than not take time before being fully put into place and completed.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Open in App

Related Stories

CricketIt's part of game, can understand: Rahul reflects on Gill's fiery exchange with Crawley

Cricket"He was in lot of pain gripping the bat": KL Rahul on Rishabh Pant's finger injury

Other SportsNeeraj Chopra to face gold medallist Arshad Nadeem in Silesia Diamond League next month

InternationalUnion Minister Hardeep Singh Puri concludes "fruitful, productive" visit to Iceland

InternationalLavrov meets Kim Jong Un as North Korea backs Russia in Ukraine war

International Realted Stories

InternationalFormer pilot points to chip malfunction, not pilot error in initial report on AI171 tragic crash

InternationalPakistan: JUI-F chief Maulana Fazlur Rehman calls for internal change in PTI-led Khyber Pakhtunkhwa government

InternationalEmpowering girls through education: Namo Lakshmi Yojana fuels dreams across Gujarat

International"Aid shipments have been restored": Zelensky confirms resumed US aid

InternationalIsraeli strike kills one in south Lebanon amid ceasefire tensions