City
Epaper

Mumbai Local Train Update: Trains in Central Line Running 20-25 Minutes Behind Schedule Due to Express Train Traffic

By Lokmat English Desk | Updated: June 5, 2024 11:30 IST

Mumbai Central Line Local Train Update: Commuters traveling towards Chhatrapati Shivaji Maharaj Terminus (CSMT) faced substantial delays Today, June 5. Consequently, trains are presently running late by approximately 20-25 minutes.

Open in App

Mumbai, June 5: Commuters traveling towards Chhatrapati Shivaji Maharaj Terminus (CSMT) faced substantial delays Today, June 5. The disruptions stem from train bunching and the concurrent use of tracks by express trains. Consequently, trains are presently running behind schedule by approximately 20-25 minutes.

We sincerely apologize for the inconvenience caused by the delay in our local trains in Mumbai. We understand the frustration and inconvenience this may have caused to your travel plans, said Senior Divisional Operation Manager (Coaching), Mumbai Division, Central Railway.Daily commuters traveling on the Central Line are frustrated due to the frequent morning delays of local trains, as people aim to reach their offices on time. Many have shared their frustration on social media. Check the tweets below:

The pre-monsoon showers that drenched Mumbai on Wednesday morning brought a welcome respite from the oppressive heat. Residents, overjoyed by the downpour, flooded social media platforms, including X (formerly Twitter), with videos capturing the Mumbai rains. Rainfall was widespread, reaching areas like Borivali and Kandivali, offering much-needed relief to residents seeking relief from the scorching temperatures.

Tags: Mumbai Local Train UpdateMumbai Local TrainsCentral LineMumbai Rains
Open in App

Related Stories

MumbaiMumbai Local Train News: City To Get India’s First Non-AC ‘Closed-Door’ Local

MumbaiMumbai Local Train Update: Virar–Dadar Fast Train Skips Bhayandar Stop, Leaves Commuters Stranded

MumbaiMumbai Rain Update: Light Showers And Cloudy Skies Likely Today; Temperatures Around 34 Degrees Celsius

MumbaiMumbai Viral Video: Commuters Sit on Railings Between Tracks to Catch Train Amid Rush

MumbaiMumbai Local Train Update: Services Delayed on Central and Harbour Lines

Maharashtra Realted Stories

MumbaiDaylight Heist in Kurla: Jeweller Duped of ₹15 Lakh by Fake Cops in Filmy-Style Robbery

MumbaiGujarat Drug Trafficker Busted in Mumbai, Multi-Crore Synthetic Drug Racket Exposed

MumbaiLadki Bahin Yojana: Stop Scheme If No Funds for Pension, Says Bombay HC

MumbaiMumbai Songwriter Duped of ₹3.25 Lakh on Pretext of Work with Singer Kailash Kher

MumbaiMumbai Traffic Police Crack Down on Violators; ₹7.72 Crore Fine Collected in a Month