City
Epaper

Mumbai: Old Charni Road foot over-bridge to remain shut till November 18

By Lokmat English Desk | Updated: October 7, 2022 09:49 IST

The old foot over-bridge (FOB) at the north end of Platforms 2 and 3 of Charni Road station of ...

Open in App

The old foot over-bridge (FOB) at the north end of Platforms 2 and 3 of Charni Road station of Mumbai Suburban Railways will be closed for 45 days till November 18 owing to construction work, according to Western Railways. The FOB will be closed for constructing a linkway connecting the newly constructed foot over-bridge and platforms 2 and 3.

Tags: Charni Road Bridgemumbai
Open in App

Related Stories

MumbaiMumbai: Leopard Captured After Seven-Hour Rescue Operation in Bhayandar East; 7 Injured in Attack (VIDEO)

MumbaiLeopard Attack in Mumbai: 3 Injured As Big Cat Strays Into Building in Bhayandar East (Watch Video)

MumbaiDolphins Spotted in Mumbai: Group Seen Swimming Near Worli Sea Face; Netizens React as Video Goes Viral

ThaneThane: Robber Posing as Customer Steals Gold Jewellery Tray Worth ₹2.4 Lakh near Bhiwandi; CCTV Footage Surfaces

EntertainmentPrime Video Bids Farewell to Four More Shots Please! in with Special Screening of Season 4 in Mumbai

Maharashtra Realted Stories

MaharashtraMaharashtra Weather Forecast: IMD Predicts Temperature Drop on Saturday; Several Regions May Dip Below 10°C

MumbaiYoutuber Payal Gaming Deepfake Viral Video: Maharashtra Cyber Registers FIR; Hunt for Accused Underway

Navi MumbaiNavi Mumbai Accident: Teen Motorcyclist Dies After Getting Hit by Container Trailer on Shilphata–Mahape Road

MumbaiMumbai: Senior Citizen Falls Prey to ‘Digital Arrest’ Cyber Scam, Loses ₹5 Lakh

PunePune Shocker: PG Owner Booked for Allegedly Molesting Intoxicated Woman, Police Probe On