City
Epaper

Mumbai Trans Harbour Link: All You Need to Know About India's Longest Sea Bridge

By Lokmat English Desk | Updated: January 11, 2024 16:20 IST

The Mumbai Trans Harbour Link (MTHL), now officially named "Atal Bihari Vajpayee Sewri-Nhava Sheva Atal Setu," is poised to ...

Open in App

The Mumbai Trans Harbour Link (MTHL), now officially named "Atal Bihari Vajpayee Sewri-Nhava Sheva Atal Setu," is poised to revolutionize connectivity in the region. This 22-kilometer behemoth, set to be inaugurated by Prime Minister Narendra Modi on January 12, 2024, ranks as the 12th longest sea bridge in the world. Here's a comprehensive overview of this ambitious project, covering its history, impact, and key features:

Get ready to witness a historic moment! The Mumbai Trans Harbour Link (MTHL), India's longest sea bridge and Asia's second longest, is set to be inaugurated by Prime Minister Narendra Modi on January 12th, 2024.

https://www.lokmattimes.com/maharashtra/mumbai-mthl-no-bikes-autos-allowed-on-indias-longest-sea-bridge-speed-limit-is-100-kmph/

A Marvel of Engineering:

Spanning a breathtaking 21.8 kilometers, the MTHL (now officially named "Atal Bihari Vajpayee Sewri-Nhava Sheva Atal Setu") will be the 12th longest sea bridge in the world, a testament to India's impressive infrastructure development. The bridge stretches from Sewri in south Mumbai, gracefully traversing the Thane Creek, and culminates at Chirle in Navi Mumbai, significantly reducing travel time between the two cities.

Boosting Connectivity and Development:

The MTHL is more than just a bridge; it's a catalyst for progress and economic growth. With a staggering cost of over Rs 18,000 crore, the project aims to:

Revolutionize commuting: The bridge will slash travel time between Mumbai and Navi Mumbai from a tedious 2 hours to a mere 20 minutes, significantly easing traffic congestion and improving the lives of millions of commuters.Fuel economic growth: The improved connectivity will unlock new business opportunities, attract investments, and boost development in Navi Mumbai and surrounding areas.Strengthen infrastructure: The MTHL is a crucial piece of India's ambitious infrastructure development plans, aimed at enhancing urban mobility and connectivity throughout the country.

Key Highlights:

  • Inauguration by PM Modi on January 12th, 2024.
  • 21.8 km long, with 16.5 km over the sea and 5.5 km on land.
  • 6-lane sea link with a speed limit of 100 km/h for cars and 40 km/h on bridge ascents and descents.
  • Two-wheelers, three-wheelers, and tractors are not permitted.
Tags: Mumbai Trans Harbour link InaugurationMumbai NewsMthl
Open in App

Related Stories

MumbaiMumbai: Two Brothers Arrested in Govandi for Stealing ₹45 Lakh Cash from Chartered Accountant

MumbaiMumbai Cyber Fraud: 75-Year-Old Retired Executive Duped ₹70 Lakh In The Name of Pahalgam Terror Attack

MumbaiMumbai Police EOW Files 250-Page Chargesheet Against Businessman Birju Salla in ₹12.77 Crore Fraud Case

MumbaiMumbai: Fired Employee Attacks Medical Shop Staff with Knife At Malabar Hill

MumbaiMumbai: Fresh Revelations Emerge in IndusInd Bank Irregularities

Maharashtra Realted Stories

MaharashtraKolhapur Shocker: Man Throws Chutney in Wife’s Eyes, Hacks Her to Death With Sickle

ThaneThane: Teen Dies After Falling Into Open Drain in Dombivli During Navratri Bhandara

MaharashtraSamruddhi Expressway Accident: 2 Men Killed, 2 Injured as Speeding Truck Rams Pickup in Washim

PunePune Crime: Police Bust Prostitution Racket Under Guise of Massage Parlour in Kharadi

MumbaiMumbai Police Arrest Fugitive Accused in Share Fraud Case After 21 Years