City
Epaper

Mumbai Trans-Harbour Link to open for traffic in November: Eknath Shinde

By Lokmat English Desk | Updated: January 12, 2023 10:05 IST

Maharashtra Chief Minister Eknath Shinde on Wednesday said that as much as 90 per cent civil work of the ...

Open in App

Maharashtra Chief Minister Eknath Shinde on Wednesday said that as much as 90 per cent civil work of the Mumbai Trans-Harbour Link (MTHL) is complete, and the bridge will be open for traffic in November this year.  Of the 22 km long bridge, a 16.5 km-long-stretch is above the sea. The MMRDA, a Maharashtra government agency, is the implementing authority for the six-lane MTHL project, financed by the Japan International Cooperation Agency (JICA)

The MTHL project will link south Mumbai with Navi Mumbai township. The MMRDA, a Maharashtra government agency, is the implementing authority for the 21.8 km six-lane MTHL project, financed by the Japan International Cooperation Agency. When completed, it would be the longest sea bridge in India and would cater to 70,000 vehicles daily. The objective of the project is to improve connectivity in Mumbai Metropolitan Region by constructing the Mumbai Trans Harbour Link (MTHL) connecting Mumbai with Navi Mumbai, mitigating traffic congestion and promoting economic development.

This "longest sea bridge in the country" will be the first to have Open Road Tolling (ORT) system, an official release quoted him as saying. Once the bridge opens for traffic, it will be possible to travel from Sewri in central Mumbai to Chirle in Navi Mumbai in 15-20 minutes, Shinde said. Vehicles won't have to stop on the bridge for paying toll thanks to the Open Tolling System, he said. This system is currently used in Singapore, officials of the Mumbai Metropolitan Region Development Authority (MMRDA) said. In the presence of chief minister Shinde, MMRDA successfully launched the first longest Orthotropic Steel Deck (OSD) in package-2 of Mumbai Trans-Harbour Link (MTHL) on Wednesday, the authority said in a press release. The first longest OSD of package-2 of about 22 km long Trans-Harbour link between Mumbai and Navi Mumbai is 180 meters long and weighs 2300 metric tonnes. The release highlighted that MTHL's package 2 has 32 OSD spans and of these 15 spans have already been launched. 

Tags: Mumbai Trans Harbour LinkEknath Shindemumbaimaharashtra
Open in App

Related Stories

MaharashtraMaharashtra Student Neelam Shinde Dies in US After 14 Months in Coma; Family Fulfils Her Last Wish

PunePune Shocker: Drunken Son Attacks 55-Year-Old Mother, Abuses Police; Arrested

MumbaiMumbai Fraud: Man Posing as BMC Official Held for Demanding Bribe Over Debris in Juhu

MumbaiMumbai Weather Update: Temperature Likely To Be 32 Degrees in City; AQI in 'Good' Category

MumbaiVirar Station Upgrade Completed: Platforms Expanded to Run 15-Coach Local Trains

Maharashtra Realted Stories

MumbaiDhurandhar 2 Leaked: Maharashtra Cyber Police Registered Case Over Leak of Aditya Dhar’s Film ‘Dhurandhar - The Revenge’ on Telegram

MumbaiMumbai: 25 Motorcycles Set On Fire in Dharavi; Case Registered

MumbaiMaharashtra Cyber Cell Busts Fake Currency Racket Operated via Instagram; Two Arrested

MumbaiMumbai: Man Sets Fire to Nameplate Near Kirit Somaiya’s Office in Mulund After Gym Dispute; Video Surfaces

MumbaiMumbai Accident: Two Youths Killed, One Critically Injured After Private Bus Rams Bike in Mumbra