City
Epaper

Mumbai Trans-Harbour Link to open for traffic in November: Eknath Shinde

By Lokmat English Desk | Updated: January 12, 2023 10:05 IST

Maharashtra Chief Minister Eknath Shinde on Wednesday said that as much as 90 per cent civil work of the ...

Open in App

Maharashtra Chief Minister Eknath Shinde on Wednesday said that as much as 90 per cent civil work of the Mumbai Trans-Harbour Link (MTHL) is complete, and the bridge will be open for traffic in November this year.  Of the 22 km long bridge, a 16.5 km-long-stretch is above the sea. The MMRDA, a Maharashtra government agency, is the implementing authority for the six-lane MTHL project, financed by the Japan International Cooperation Agency (JICA)

The MTHL project will link south Mumbai with Navi Mumbai township. The MMRDA, a Maharashtra government agency, is the implementing authority for the 21.8 km six-lane MTHL project, financed by the Japan International Cooperation Agency. When completed, it would be the longest sea bridge in India and would cater to 70,000 vehicles daily. The objective of the project is to improve connectivity in Mumbai Metropolitan Region by constructing the Mumbai Trans Harbour Link (MTHL) connecting Mumbai with Navi Mumbai, mitigating traffic congestion and promoting economic development.

This "longest sea bridge in the country" will be the first to have Open Road Tolling (ORT) system, an official release quoted him as saying. Once the bridge opens for traffic, it will be possible to travel from Sewri in central Mumbai to Chirle in Navi Mumbai in 15-20 minutes, Shinde said. Vehicles won't have to stop on the bridge for paying toll thanks to the Open Tolling System, he said. This system is currently used in Singapore, officials of the Mumbai Metropolitan Region Development Authority (MMRDA) said. In the presence of chief minister Shinde, MMRDA successfully launched the first longest Orthotropic Steel Deck (OSD) in package-2 of Mumbai Trans-Harbour Link (MTHL) on Wednesday, the authority said in a press release. The first longest OSD of package-2 of about 22 km long Trans-Harbour link between Mumbai and Navi Mumbai is 180 meters long and weighs 2300 metric tonnes. The release highlighted that MTHL's package 2 has 32 OSD spans and of these 15 spans have already been launched. 

Tags: Mumbai Trans Harbour LinkEknath Shindemumbaimaharashtra
Open in App

Related Stories

MumbaiMumbai Coastal Road Fire: Blaze Erupts at Northbound Entry, Traffic Affected Near Marine Drive (VIDEO)

HealthRising AQI Levels Trigger Health Concerns: Effective Ways to Stay Safe This Winter

MaharashtraLatur: Minor Dalit Girl Kidnapped and Raped By 18-Year-Old Man, Case Against Cafe Land Owner

LifestyleChristmas 2025 Special: Best Places to Visit in Mumbai for a Perfect Festive Experience

MumbaiMumbai Police Rescue 9-Foot-Long Python From Dharavi, Share Video

Maharashtra Realted Stories

MumbaiMumbai: Luxury SUV Caught Speeding at 250 kmph on Bandra-Worli Sea Link; Police Take Action

MumbaiMumbai Local Train Update: Automatic Doors Planned for 238 Trains, More Stops to Boost Palghar–Boisar Connectivity

MumbaiBMC Elections and Local Body Polls 2026: Everything You Need to Know About Mumbai and Statewide Civic Bodies

MumbaiJolt to Congress Ahead of Local Body Polls as MLC Pradnya Satav Set to Join BJP: Reports

MumbaiMumbai Shocker: Minor Girls Raped After Being Drugged in Soft Drinks; Accused Arrested Within Six Hours