City
Epaper

Mumbai Trans-Harbour Link to open for traffic in November: Eknath Shinde

By Lokmat English Desk | Updated: January 12, 2023 10:05 IST

Maharashtra Chief Minister Eknath Shinde on Wednesday said that as much as 90 per cent civil work of the ...

Open in App

Maharashtra Chief Minister Eknath Shinde on Wednesday said that as much as 90 per cent civil work of the Mumbai Trans-Harbour Link (MTHL) is complete, and the bridge will be open for traffic in November this year.  Of the 22 km long bridge, a 16.5 km-long-stretch is above the sea. The MMRDA, a Maharashtra government agency, is the implementing authority for the six-lane MTHL project, financed by the Japan International Cooperation Agency (JICA)

The MTHL project will link south Mumbai with Navi Mumbai township. The MMRDA, a Maharashtra government agency, is the implementing authority for the 21.8 km six-lane MTHL project, financed by the Japan International Cooperation Agency. When completed, it would be the longest sea bridge in India and would cater to 70,000 vehicles daily. The objective of the project is to improve connectivity in Mumbai Metropolitan Region by constructing the Mumbai Trans Harbour Link (MTHL) connecting Mumbai with Navi Mumbai, mitigating traffic congestion and promoting economic development.

This "longest sea bridge in the country" will be the first to have Open Road Tolling (ORT) system, an official release quoted him as saying. Once the bridge opens for traffic, it will be possible to travel from Sewri in central Mumbai to Chirle in Navi Mumbai in 15-20 minutes, Shinde said. Vehicles won't have to stop on the bridge for paying toll thanks to the Open Tolling System, he said. This system is currently used in Singapore, officials of the Mumbai Metropolitan Region Development Authority (MMRDA) said. In the presence of chief minister Shinde, MMRDA successfully launched the first longest Orthotropic Steel Deck (OSD) in package-2 of Mumbai Trans-Harbour Link (MTHL) on Wednesday, the authority said in a press release. The first longest OSD of package-2 of about 22 km long Trans-Harbour link between Mumbai and Navi Mumbai is 180 meters long and weighs 2300 metric tonnes. The release highlighted that MTHL's package 2 has 32 OSD spans and of these 15 spans have already been launched. 

Tags: Mumbai Trans Harbour LinkEknath Shindemumbaimaharashtra
Open in App

Related Stories

MumbaiMumbai Road Accident: Speeding Tanker Kills Elderly Woman in Andheri; Husband Critically Injured

MumbaiEOW Cracks Down on Mithi River Scam: Two Held, BMC Officials Accused in ₹65.5 Crore Fraud

AurangabadFake Currency Racket Busted in Maharashtra: Counterfeit Notes Worth Rs 60 Lakh Seized from Bungalow in Ahilyanagar; 7 Arrested

MaharashtraBeed: Locals Pelt Stones at MSRTC Buses After Autorickshaw Driver Killed in Accident Near Pangari Tanda in Parli

MumbaiPolice Busts Chaddi-Baniyan Gang After Burglary Cases Reported in Mumbai, Navi Mumbai and Thane

Maharashtra Realted Stories

MaharashtraNanded: School Teacher Found Dead in Lodge Room at Maharashtra's Pimpalgaon Mahadev

MumbaiMumbai Local Train Commuter Attacks Railway Staff, Vandalises Office at Borivali Station After Being Caught Without Valid Ticket (VIDEO)

ThaneThane: Schoolgirl Attacked by Pack of Stray Dogs in Ulhasnagar; Video Surfaces

MumbaiMumbai Crime Branch Seizes Rs 25.5 Lakh Worth of Banned E-Cigarettes From Kurla Shops; One Arrested

MumbaiMumbai: After 177 Days, Devotees Bid Farewell to Charkop Cha Raja (Watch Video)