City
Epaper

Mumbai: Western Railway commissions sixth line between Khar and Goregaon stations

By Lokmat English Desk | Updated: November 7, 2023 10:18 IST

A Western Railway official confirmed that the 6th line between Khar and Goregaon stations in Mumbai has been officially ...

Open in App

A Western Railway official confirmed that the 6th line between Khar and Goregaon stations in Mumbai has been officially inaugurated. This significant development will lead to the expansion of train services and an enhancement in punctuality. According to a release from WR, this 8.8-kilometer stretch was completed successfully on November 5, including a speed trial that reached 112 kilometers per hour. The construction of this line began on October 7 and was completed within a 30-day block period, necessitating the cancellation or short termination of several long-distance and suburban trains.

The entire work involved laying of 12 turnouts and three trap points on the existing fifth line and both the fast lines. The work also comprised laying of eight turnouts on the new 6th line and dismantling of existing nine turnouts and three trap points from the existing lines, explained WR chief public relations officer Sumit Thakur. Independent connectivity to both 5th and 6th lines has been provided to Bandra Terminus yard after slewing of 700m existing track and dismantling of five points, including a diamond crossing, he said.

This project will enhance the line capacity of Mumbai suburban section, ease congestion, improve punctuality and help to add more train services, Thakur added. The 6th line project involved acquisition of private land as well as government land (BMC), while 27 new foot overbridges were constructed in lieu of existing FOBs that were infringing the alignment, he said.

Existing railway structures which were obstructing were dismantled and new structures were constructed to replace them. Apart from construction of new flats for railway employees, around 607 Project Affected People (PAPs) were rehabilitated and provided with alternate accommodation. Some 1000 trees were relocated and transplanted, he said.

Tags: Mumbai NewsmumbaiWestern RailwayMumbai Local Trains
Open in App

Related Stories

EntertainmentShah Rukh Khan’s Annual Birthday Fan Meet Outside Mannat Cancelled, Actor Says “I Will Miss Seeing You” (See Post)

MumbaiMumbai: Case Registered Against Organizers of Opposition’s ‘Satyacha Morcha’

MumbaiMumbai Crime : Gas Cylinder Delivery Worker Kidnapped Twice, Extorted of ₹1.45 Lakh; Three Arrested by MIDC Police

MumbaiIndiGo Flight Diverted to Mumbai After Bomb Threat at Hyderabad Airport

MumbaiMumbai: 23-Year-Old Woman Dies by Suicide After Alleged Domestic Harassment By In-laws in Ghatkopar

Maharashtra Realted Stories

PunePune Accident: 2 Killed, 1 Injured As Car Crashes Into Metro Station Pillar (VIDEO)

PunePune: 42-Year-Old Woman Assaulted, Phone Snatched Over Social Media Post

Navi MumbaiNavi Mumbai Traffic Advisory: 5-Km Walkathon to Mark Sardar Patel’s Birth Anniversary to Affect Sunday Morning Routes

MumbaiMumbai: Over ₹100 Crore Lost to ‘Digital Arrest’ Scams, Police Alert Senior Citizens

MumbaiMumbai Shocker: Coconut Vendor Murdered in Govandi Over Cash Dispute, Accused Nabbed