City
Epaper

Pune: Temporary traffic diversion implemented as construction begins for pedestrian subway at Kasba Peth, check details here

By Lokmat English Desk | Updated: July 12, 2023 15:37 IST

Construction work on the Pune Metro project has begun in Kasba Peth, undertaken by the Maharashtra Metro Rail Corporation ...

Open in App

Construction work on the Pune Metro project has begun in Kasba Peth, undertaken by the Maharashtra Metro Rail Corporation Ltd. As part of this project, a pedestrian subway will be built connecting Kasba Peth metro station to Budhwar Peth metro station. To accommodate these construction activities, temporary traffic adjustments have been put in place in the designated area, specifically from Pavle Chowk to Kamla Nehru Chowk (Agarwala Road) in Kasba Peth.

The Pune Police Traffic Department issued a circular informing citizens of the modifications. The pedestrian subway will be built between Sattoti Chowk in Kasba Peth to the Budhwar Peth Metro Station. As a result, three-wheelers, four-wheelers, and heavy vehicles travelling from Pawle Chowk to Kamla Nehru Hospital have been temporarily restricted. Vijayakumar Magar, Deputy Commissioner of Police, has advised all vehicles, excluding two-wheelers, to take alternate roads at this time.

For motorists traveling towards Kamla Nehru Hospital via Agarwal Road from Pavle Chowk, the following alternative routes are suggested:

  • From Pawle Chowk, take Punyashwar Road to Kumbharves Chowk, then turn right onto Baburao Awad Path Road to reach the desired destination.
  • From Pawle Chowk, take Dagdi Pal Road via Manik Chowk to Phadke Houd Chowk, then proceed on Ganesh Road to reach the desired destination.

 

Alternative routes from Kamla Nehru Hospital Chowk to Pavle Chowk via Agarwal Road for motorists

 

For motorists traveling from Kamla Nehru Hospital Chowk to Pavle Chowk via Agarwal Road, the following alternative routes are recommended:

  • From Kamla Nehru Chowk, take a left turn onto Maharana Pratap Road, continue to Devjibaba Chowk, then proceed on Ganesh Road to reach the destination.
  • From Kamla Nehru Chowk, turn right via Baburao Awhad Path to Kasba Peth Regional Office, then take a left turn via Kumbharves to Veer Santaji Ghorpade Road, leading to the destination.

 

During the construction of the pedestrian subway, these temporary traffic adjustments aim to ensure a smooth flow of automobiles and pedestrian safety. To avoid inconvenience, commuters should get familiar with alternative routes and schedule their journey accordingly.

Tags: Maharashtra NewspuneKasba PethTraffic Branch
Open in App

Related Stories

MumbaiDussehra Melava 2025: Shiv Sena (UBT) Chief Uddhav Thackeray Compares BJP to Amoeba, Comments on PM’s Manipur Visit

PunePune Crime: 70 Kg Silver Looted From Gurwar Peth Shop, Police Recover Half From Arrested Accused

PunePune Crime: Rickshaw Driver Assaulted, Robbed of Cash and Mobile in Kasarwadi

MumbaiMumbai Shocker: Elderly Man Attempts Self-Immolation Outside Mantralaya Over Unheard Complaints

MumbaiDussehra 2025: Know Ravana Dahan Time in Mumbai, Astrological Yogas and Ritual Highlights

Maharashtra Realted Stories

MumbaiMumbai Crime Rate Drops 35% in 2023, Cybercrime Sees Sharp Rise: NCRB Report

MumbaiMumbai: Cyber Fraud Targets Police Constable, Rs 94,103 Lost from Bank Account

Navi MumbaiNavi Mumbai: Youth Arrested for Molesting Teen Girl After Befriending Her on Social Media

MumbaiChennai Woman Caught Trying to Smuggle Gibbons at Mumbai Airport, Animals Rescued

MaharashtraManoj Jarange Gives Ultimatum to Govt, Announces Further Agitation If Farmers’ Demands Not Met