City
Epaper

Railway Ministry Sanctions Final Survey for 100-Km Nashik-Dahanu Line, Reducing Travel Time

By Lokmat English Desk | Updated: August 30, 2024 18:51 IST

The Railway Ministry has approved the final location survey for a new 100-kilometre railway line connecting Nashik and Dahanu ...

Open in App

The Railway Ministry has approved the final location survey for a new 100-kilometre railway line connecting Nashik and Dahanu via Trimbakeshwar and Vangaon. This new line, which will span across Nashik and Palghar districts, is expected to significantly reduce travel time between these two key locations, according to a Central Railway spokesperson.

"Currently, to reach Dahanu from Nashik, trains travel via Kalyan-Bhiwandi-Vasai on the south side or Dhule-Nandurbar-Surat via the north side. The new link is expected to reduce travel time and distance between the two cities. It will boost tourism and provide rail transportation to devotees desirous of visiting Trimbakeshwar temple for darshan of one of the 12 Jyotirlingas and to Panchavati (where Lord Ram stayed during the exile) in Nashik," a Central Railway release stated.

The new line will also enhance connectivity from the Deccan Plateau to the Vadhvan Port in Dahanu, for which the foundation stone was laid by Prime Minister Narendra Modi earlier today, officials reported. According to a spokesperson, the line will link several towns across Nashik and Palghar districts, promoting economic growth and development in the area. For the final location survey of this new railway line, the ministry has allocated Rs. 2.50 crore. 

Tags: Railway MinistryDahanuNashikRailways
Open in App

Related Stories

NashikNashik: Youth Cheated of Rs 10.51 Lakh on Pretext of PWD Clerk Job

MaharashtraMaharashtra Local Body Election Results 2025: Vote Counting Begins in Palghar, Dahanu and Jawhar Under Tight Security

NashikNashik Shivers as Cold Wave Intensifies; Temperature Drops to Season Low of 6.9°C

NashikNashik Shocker: Former Zilla Parishad Member Kailas Chaudhary Found Dead After Eight Days Missing

MaharashtraMumbai Thane Traffic Update: Kalwa Kharegaon Underpass on NH-3 Closed from Dec 15 to Jan 9 – Check Alternate Routes & Details

Maharashtra Realted Stories

MumbaiMumbai Customs Seize 24 Kg Hydroponic Weed Worth Rs 24 Crore at Airport; 9 Passengers Arrested

MumbaiMumbai: Woman Brutally Murdered Over Loan Dispute in Ghatkopar; Neighbouring Auto-Rickshaw Driver Arrested

MumbaiBMC Elections 2026: AAP Releases ‘Kejriwalchi Guarantee’ Manifesto, Promises Free Water, Power, Education and Healthcare

MumbaiNew Year 2026: Mumbai Police Tighten Security as City Gears Up for Celebrations, Over 17,000 Police Personnel Deployed

MumbaiMumbai New Year Celebrations 2026: Siddhivinayak Temple Announces Special Darshan Timings For January 1 - Check Details