City
Epaper

Surat starts construction of modern ballastless track for Mumbai-Ahmedabad bullet train project

By Lokmat English Desk | Updated: August 31, 2023 16:34 IST

The National High Speed Rail Corporation Limited (NHSRCL) announced in a release that construction of Surat's ballastless track has ...

Open in App

The National High Speed Rail Corporation Limited (NHSRCL) announced in a release that construction of Surat's ballastless track has started as part of the Mumbai-Ahmedabad bullet train project. 

NHSRCL called the J-slab ballastless track system, used in Japan’s high-speed rail system Shinkansen, a first in India. While the traditional or ballasted track comprises rail fixed to sleepers supported by crushed stones, the bed is composed of reinforced concrete (RC) in the case of the ballastless track.

As per the release, the construction of the RC bed for the track system has begun from Surat and it comprises a pre-cast track slab over which fastening devices and rails are fitted.  Once functional, the country’s first bullet train between Ahmedabad and Mumbai will run at a maximum speed of 350 km per hour, covering the 508-km stretch in under three hours.

The track slab rests on the RC track bed, which has a thickness of approximately 300 mm and is 2420 mm wide. It is constructed in-situ (at site) for individual UP and Down track lines, said the release. RC anchors are provided to avoid any longitudinal and lateral restraint to the track slab, said the release. More than 14000 MT of JIS rails, 50 moulds for casting track slabs have already been received from Japan, it said. The track slabs will be manufactured in dedicated factories and two such units have already been set up, said NHSRCL.

The total cost of the Mumbai-Ahmedabad bullet train project is pegged at Rs 1.08 lakh crore. As per the shareholding pattern, the Centre is to pay Rs 10,000 crore to NHSRCL, while Gujarat and Maharashtra are required to pay Rs 5,000 crore each. The rest is to be financed by Japan through a loan at 0.1 per cent interest.  

Tags: Maharashtra NewsMumbai NewsMumbai-ahmedabad bullet train project
Open in App

Related Stories

MumbaiMumbai Local Train Update: Virar–Dadar Fast Train Skips Bhayandar Stop, Leaves Commuters Stranded

PunePune Water Cut: 15% Supply Reduction Begins From April 9 Amid El Niño Concerns

CricketMumbai: Smriti Mandhana–Palash Muchhal Reunion Rumours Ignite After Viral Restaurant Video

MumbaiMumbai Car Loan Scam: Fake Recovery Agents Chase Man for Alleged EMI Dues of Vehicle on Eastern Express Highway

MumbaiMumbai: Attempt to Murder Accused Escapes from Sessions Court, Manhunt Launched

Maharashtra Realted Stories

MaharashtraDharashiv: Gas Agency Distributor Attempts Suicide During Online Meeting Over Financial Stress

MaharashtraSunetra Pawar Set to Win Baramati Assembly By-Poll As Congress Withdraws Candidate

MaharashtraParth Pawar Takes Oath As Rajya Sabha MP, Wears Father Ajit Pawar’s Pink Jacket

MaharashtraED Raid in Kolkata: Central Agency Raids 7 Premises of Merlin Project in Real Estate Scams Case

PoliticsBaramati By-Poll To Be Held Unopposed, But Congress Is National Party So..., Says Sharad Pawar