City
Epaper

Two new Mumbai Metro Lines to be operational from April 2

By Lokmat English Desk | Updated: April 1, 2022 11:18 IST

The two new Metro lines will become operational on April 2. While Metro 2A line will connect Dahisar to ...

Open in App

The two new Metro lines will become operational on April 2. While Metro 2A line will connect Dahisar to DN Nagar (Andheri West), Metro line 7 will run from Dahisar East to Andheri East. The new corridors — Line 2A and Line 7 — will be the city's first lines to be operational since June 8, 2014, when Mumbai Metro opened its first corridor (Versova-Andheri-Ghatkopar).Built on the Link Road and the Western Express Highway, both Metro 2A and 7 routes will reduce traffic congestion on roads and suburban railways. 

The frequency of the metro will be every 10 minutes initially and will gradually decrease after more rakes are pressed into service. Mumbai Metro Line 2A from Dahisar to DN Nagar is an 18.589 km long elevated corridor with 17 stations. It will provide rail-based access to the commercial and geographical landmarks in Mumbai. Metro Line 7 from Andheri East to Dahisar East is a 16.475 km long elevated corridor with 13 stations. This line will provide a smooth interchange between Andheri, JVLR, and Dahisar. It will also provide rail-based access to the Mumbai International Airport (CSIA), SEEPZ, National Park, and other commercial landmarks. The minimum fare for Metro lines 2A and 7 will be Rs 10 for a distance of up to 3 km. The maximum fare will be Rs 50 for covering a distance up to 30 km.

Tags: Mumbai MetroMumbai metro line
Open in App

Related Stories

MumbaiMumbai Metro Line 2A & 7 Services to Start Late on December 12 – Check New Timings and Key Details Here

MumbaiMumbai Metro Launches QR Ticketing on 14+ Apps: See Which App Supports Which Metro Line

ThaneMumbai Metro Line 4 to Get Direct Connectivity to Kanjurmarg Railway Station? Key Details Inside

MumbaiMumbai Metro Line 8 to Connect CSMIA and NMIA: Full Route, Stations, and Benefits Explained

MumbaiMumbai Metro Line 9 & 2B Update: Dahisar–Kashigaon and Chembur–Mandale Metro Stretches Likely to Open by December 31

Maharashtra Realted Stories

Maharashtra‘Maharashtra Stands Firmly With Development’: PM Modi on BJP-Led Mahayuti’s Civic Poll Win

PuneJejuri Fire Incident: 18 Injured as Blaze Erupts During Victory Rally After Maharashtra Local Body Election 2025 in Pune District (VIDEO)

MaharashtraAmit Shah Congratulates Mahayuti Leaders on Big Win in Maharashtra Local Body Polls

Maharashtra"Shiv Sena (UBT)–MNS Alliance Announcement in 2–3 Days": Sanjay Raut Ahead of Municpal Corporations Elections

MaharashtraMaharashtra Local Body Election Results 2025: “Such a Victory Has Not Been Seen in Last 30–35 Years,” Says Devendra Fadnavis