City
Epaper

Elphinstone Bridge Closure Postponed After Protests, MMRDA Officials to Meet Locals on April 28

By Lokmat English Desk | Updated: April 27, 2025 15:20 IST

Officials from the Mumbai Metropolitan Region Development Authority (MMRDA) and local residents will meet on April 28 to discuss ...

Open in App

Officials from the Mumbai Metropolitan Region Development Authority (MMRDA) and local residents will meet on April 28 to discuss the future of the historic Elphinstone Road Over Bridge, which is due to be dismantled for the construction of the Sewri-Worli link. Originally, the 125-year-old bridge was scheduled to close at midnight on Saturday in order to start the Worli-Sewri elevated road project's dismantling. However, following numerous complaints and protests by locals, particularly those from two adjoining buildings that would be demolished for the project, the closure was postponed. 19 buildings will be affected from this project and Laxmi Niwas and Haji Noorani buildings will impact the most.

On Friday evening, tensions increased as tenants of 19 buildings that were impacted gathered at around 9 PM to take down barricades that had been put up to stop traffic. Protesters charged that officials were opaque and had not provided a clear strategy for rehabilitation for individuals who would be displaced.

Ashish Shelar, the Mumbai suburban guardian minister, intervened to defuse the tension. He promised the locals who were protesting that Chief Minister Devendra Fadnavis would hear their concerns. Additionally, Shelar admitted that two particular structures were at risk during the demolition process and pledged to find a workable solution. Residents expressed their concerns about the lack of planning and communication when they saw Shelar at his Bandra office on Saturday. Shelar informed them that in order to find a solution that takes into account the complaints of individuals impacted, he would talk about the matter with the Chief Minister and MMRDA authorities.

Also Read: Mumbai Traffic Update: Elphinstone Bridge to Shut Down for Demolition and New Construction Work from April 25 – Details Inside

Kalidas Kolambkar, a local MLA, also stepped in and got the Chief Minister's Office to temporarily halt the bridge's closure. This delay will last until the meeting on April 28, when officials are supposed to present a strategy for the project's impacted individuals and work to address their concerns. The Sewri-Worli connecting project's next steps and the future of the Elphinstone Bridge, which has served as an essential link for the city for more than a century, will be greatly influenced by the conclusion of the meeting.

Tags: Elphinstone BridgeDadarMumbai NewsSewri-worli elevated corridorMaharashtra News
Open in App

Related Stories

MumbaiDog Kennel Worth ₹10 Crore Being Built for Mumbai Police’s Dog Squad

MumbaiMumbai: Four Duped of Rs 15.25 Lakh in Fake Government Job Racket Scam, Two Booked

MumbaiMumbai Tragedy: 14-Year-Old Boy Drowns in Metro Work Pit, Case Registered Against Construction Supervisor

MumbaiMumbai: BMC Urged Residents to Boil Water After Reservoir Repair Work; Check Affected Areas

MumbaiMumbai Airport Customs Seize Hydroponic Weed Worth ₹24.66 Crore, Three Held

Mumbai Realted Stories

PunePune Road Accident: 47-Year-Old Warkari On The Way To Alandi Dies After Being Hit by Bus Near Shikrapur

MumbaiMumbai Shocker: Man Attacked with Beer Bottle Over Hafta in Chembur, 5 Accused Arrested

Navi MumbaiNavi Mumbai: Work Begins on Mangrove Parks as Forest Dept Appoints Architects

PunePune Rains: Heavy Showers Flood Hinjawadi Roads, IT Workers Stuck in Long Traffic Jams

MaharashtraGaneshotsav 2025 Special: Ganpati Special Train Reservation For Konkan To Start From June 23