City
Epaper

Goregaon-Mulund Link Road: PM Modi To Perform Bhoomi Pujan for Twin Tunnel Work Today

By Lokmat English Desk | Updated: July 13, 2024 12:19 IST

Mumbai, July 13: Mumbai Municipal Corporation is currently in the process of executing the Goregaon-Mulund Link Road project, a ...

Open in App

Mumbai, July 13: Mumbai Municipal Corporation is currently in the process of executing the Goregaon-Mulund Link Road project, a significant infrastructure initiative aimed at bridging the gap between the eastern and western suburbs through a well-connected road network. Today, on July 13, Prime Minister Narendra Modi is set to preside over the auspicious Bhoomi Pujan ceremony, marking the commencement of this transformative project.

Central to this project are the two tunnels that will go under the Sanjay Gandhi National Park, aiming to significantly reduce travel time between Goregaon and Mulund to just 25 minutes. This initiative highlights the dedication to improving urban connectivity and accessibility, marking a crucial move towards better integration in Mumbai's metropolitan area.

Details about this project

  • Re-modelling of Kalyan Yard and Gati Shakti Multi Model Cargo Terminal at Turbhe in Navi Mumbai.
  • Inauguration of new platform at Lokmanya Tilak Terminus and extension of Platform No. 10 and 11 at Chhatrapati Shivaji Maharaj Terminus Station

Total length of the project - 12.20 Kms

In the first phase, widening of the existing flyover (ROB) along the tracks near Nahur railway station. In the second phase widening of 30m wide road to 45.70m. Construction of Flyover, Elevated Rotary in Phase 3 (a).

Phase 3 (B) includes a 1.22 km triple-lane (3 by 3) box tunnel (cut and cover) at Dadasaheb Phalke Chitranagari, Goregaon and a 4.7 km twin tunnel each under Sanjay Gandhi National Park.

The fourth phase includes the proposed double-level flyover crossing the Eastern Expressway from Nahur to Airoli toll plaza and the Vehicular Underway (VUP) at the junction of Western Expressway and GMLR.

What are the benefits?

  1. The Goregaon-Mulund Expressway is the fourth major expressway connecting the eastern and western suburbs of Mumbai. A huge benefit to traffic especially in North Mumbai. The project will create a new link between the east-west suburbs. Hence, relief from traffic jams.
  2. The project will provide the western suburbs with direct connectivity to the proposed new airport at Navi Mumbai and the Pune-Mumbai Expressway.
  3. Vehicles plying on Nashik highway will also benefit from this project.
  4. Travel distance will be reduced by about 8.80 km compared to Jogeshwari-Vikhroli link road.
  5. Travel time between Goregaon and Mulund will be reduced from 75 minutes to around 25 minutes
Tags: Brihanmumbai Municipal CorporationMulundGoregaonMaharashtra NewsNarendra ModiGoregaon Mulund Link Road
Open in App

Related Stories

PunePune Crime: Doctor Robbed at Knifepoint After Being Lured on Pretext of Medical Examination

PunePune Crime: Youth Killed After Being Hit with Stone by Bike-Borne Assailants in Fursungi (VIDEO)

NashikNashik Civic Polls 2026: Nashik: BJP Leaders Fight at Election Office During Nomination Withdrawal (VIDEO)

MumbaiBMC Election 2026: Mayor’s Post Turns Flashpoint After Devendra Fadnavis Says Mahayuti Will Pick a Hindu-Marathi Mayor

MaharashtraHSRP Deadline Ends: Strict Action Begins Against Old Vehicles in Maharashtra

Mumbai Realted Stories

MumbaiMumbai Local Train Mega Block on January 4, 2026: Services to Be Affected on Central and Western Lines on Sunday

MaharashtraMaharashtra Civic Polls 2026: EC Orders Probe Into 67 Unopposed Wins Ahead of Voting, Says 'No Winners To Be Declared'

PunePune: Maharashtra Govt Approves Plan to Develop Chhatrapati Sambhaji Maharaj’s Samadhi at Vadhu Budruk in Shirur

MumbaiAshok Modak Passes Away: Former MLC and Mumbai University Professor, Dies at 85

MaharashtraRatnagiri: Ro-Ro Train Halted at Khed Station on Konkan Railway Route After Truck Load Shifts on Rake (Watch Video)