City
Epaper

Goregaon-Mulund Link Road: PM Modi To Perform Bhoomi Pujan for Twin Tunnel Work Today

By Lokmat English Desk | Updated: July 13, 2024 12:19 IST

Mumbai, July 13: Mumbai Municipal Corporation is currently in the process of executing the Goregaon-Mulund Link Road project, a ...

Open in App

Mumbai, July 13: Mumbai Municipal Corporation is currently in the process of executing the Goregaon-Mulund Link Road project, a significant infrastructure initiative aimed at bridging the gap between the eastern and western suburbs through a well-connected road network. Today, on July 13, Prime Minister Narendra Modi is set to preside over the auspicious Bhoomi Pujan ceremony, marking the commencement of this transformative project.

Central to this project are the two tunnels that will go under the Sanjay Gandhi National Park, aiming to significantly reduce travel time between Goregaon and Mulund to just 25 minutes. This initiative highlights the dedication to improving urban connectivity and accessibility, marking a crucial move towards better integration in Mumbai's metropolitan area.

Details about this project

  • Re-modelling of Kalyan Yard and Gati Shakti Multi Model Cargo Terminal at Turbhe in Navi Mumbai.
  • Inauguration of new platform at Lokmanya Tilak Terminus and extension of Platform No. 10 and 11 at Chhatrapati Shivaji Maharaj Terminus Station

Total length of the project - 12.20 Kms

In the first phase, widening of the existing flyover (ROB) along the tracks near Nahur railway station. In the second phase widening of 30m wide road to 45.70m. Construction of Flyover, Elevated Rotary in Phase 3 (a).

Phase 3 (B) includes a 1.22 km triple-lane (3 by 3) box tunnel (cut and cover) at Dadasaheb Phalke Chitranagari, Goregaon and a 4.7 km twin tunnel each under Sanjay Gandhi National Park.

The fourth phase includes the proposed double-level flyover crossing the Eastern Expressway from Nahur to Airoli toll plaza and the Vehicular Underway (VUP) at the junction of Western Expressway and GMLR.

What are the benefits?

  1. The Goregaon-Mulund Expressway is the fourth major expressway connecting the eastern and western suburbs of Mumbai. A huge benefit to traffic especially in North Mumbai. The project will create a new link between the east-west suburbs. Hence, relief from traffic jams.
  2. The project will provide the western suburbs with direct connectivity to the proposed new airport at Navi Mumbai and the Pune-Mumbai Expressway.
  3. Vehicles plying on Nashik highway will also benefit from this project.
  4. Travel distance will be reduced by about 8.80 km compared to Jogeshwari-Vikhroli link road.
  5. Travel time between Goregaon and Mulund will be reduced from 75 minutes to around 25 minutes
Tags: Brihanmumbai Municipal CorporationMulundGoregaonMaharashtra NewsNarendra ModiGoregaon Mulund Link Road
Open in App

Related Stories

ThaneThane Water Cut: TMC Announces Water Supply Disruption on May 2-3; Check Timings and Affected Areas

MaharashtraBJP Leader Radha Krishna Vikhe Patil Involved in Major Scam: Fraud Case Filed Against Him and 53 Others

ThaneThane Tragedy: 20-Year-Old Woman Dies by Suicide After Family Takes Away Her Phone

MaharashtraMaharashtra: Satara Authorities Bust Liquor Racket in Midnight Operation, Confiscate Foreign Alcohol Worth ₹84 Lakh

NashikNashik: 35 Risky Gulmohar Trees to Be Cut Ahead of Monsoon After Fatal Incidents

Mumbai Realted Stories

LifestyleHappy Maharashtra Day 2025 Wishes: Share Greetings and Quotes on WhatsApp to Celebrate Maharashtra Din

MumbaiMumbai Local Train Update: Central Railway Announces Power Blocks on Kalyan-Karjat Line Between April 29 to May 5

NashikNashik Horror: Drunk Father Strangles 8-Year-Old Son, Carries Body in Sack to Mother-in-Law’s House

MumbaiPM Modi Might Inaugurate BKC-Worli Stretch Of Mumbai Metro Line 3 On May 1

MumbaiDeven Bharti, 1994-Batch IPS Officer, Appointed New Mumbai Police Commissioner