City
Epaper

Kala Ghoda Development Phase 2: BMC Approves Road Revamp, Plaza and Parking Expansion

By Lokmat Times Desk | Updated: September 15, 2025 07:50 IST

As the first phase of Kala Ghoda precinct development reaches its final stages, the Brihanmumbai Municipal Corporation (BMC) has ...

Open in App

As the first phase of Kala Ghoda precinct development reaches its final stages, the Brihanmumbai Municipal Corporation (BMC) has given approval for the second phase of the project. This stage will focus on upgrading five major roads, along with creating a pedestrian plaza and additional parking facilities for citizens. The initiative aims to further enhance Kala Ghoda as a pedestrian-friendly hub, balancing convenience with aesthetics.

 

In Phase 2, the roads set to undergo transformation are Mahatma Gandhi Road, K. Dubash Road, Nagindas Road, Chamber of Commerce Lane, and Forbes Street. Meanwhile, Phase 1 work continues on V B Gandhi Marg, Rutherfield Street, Rope Walk Lane, Saibaba Road, and B Bharucha Road. A key highlight of Phase 2 is the proposed walking plaza, which will also include more parking facilities. As per the design, the stretch outside Rhythm House on K. Dubash Road will be turned into a plaza, while the road in front of Jehangir Art Gallery will be converted into a two-way street. The plaza will feature a mix of materials such as basalt natural and leather finish stone, maroon granite, and yellow granite for flooring. Landscaping will introduce greenery with trees and plants like Bakul, Variegated Pandanus, Heliconia Psittacorum, Purple Heart, and Golden Durante.

 

Due to the large scale of work, Phase 2 will be divided into Phase 2A and 2B. Plans for Phase 2B include extending the existing parking space at Kala Ghoda by introducing underground facilities. Former BJP corporator Makrand Narwekar highlighted that the project, guided by the vision of Maharashtra Legislative Assembly Speaker and local MLA Rahul Narwekar, will significantly transform Kala Ghoda into a greener and pedestrian-centric cultural district. According to the blueprint, lanes will be upgraded with new pavements, improved lighting, and enhanced greenery. Its proximity to cultural landmarks such as the Chhatrapati Shivaji Maharaj Vastu Sangrahalaya, Jehangir Art Gallery, National Gallery of Modern Art, Institute of Contemporary Art, and the Eliyahoo Synagogue strengthens its identity as Mumbai’s art and cultural hub. A vehicle-free zone is also part of the broader vision.

 

Narwekar, who has actively pursued the project with the civic body, confirmed that the Urban Design Architecture (UDA) plan has received BMC approvals. The estimated cost of Phase 2A stands at ₹12 crore. Once the necessary clearances from all relevant agencies are secured, the tendering process will be initiated to begin implementation.

Tags: Mumbai NewsBMCKala ghodaMaharashtra News
Open in App

Related Stories

MumbaiMumbai EOW Invokes Section 420 IPC Against Shilpa Shetty and Raj Kundra in Alleged Rs 60 Crore Fraud Case

MumbaiMumbai: Interior Designer Duped of Nearly ₹10 Lakh in Online Love Scam

MumbaiMumbai: Drunk Dumper Owner Attacks Police Personnel at Borivali Police Station; Case Registered

MumbaiBMC Elections 2026: Final Voter List Released, Mumbai Has 1.03 Crore Eligible Electors

MaharashtraMaharashtra: Eknath Shinde Announces India’s Tallest Viewing Tower Along Thane Creek

Mumbai Realted Stories

MumbaiNo Emails, No Work: Mumbai Firm Announces 11-Day Digital Detox, Showing How Logging Off Can Boost Productivity

MumbaiMumbai Customs Seize 33.4 kg of Hydroponic Weed From Bangkok Passengers, 11 Arrested

MumbaiMumbai Fire: Electrical Short Circuit Triggers Blaze at Charkop Industrial Unit in Kandivali

MumbaiWorli–Sewri Elevated Connector: Project 62% Complete, Completion Targeted by September 2026

MumbaiBMC Elections 2026: From Seats to Spending Limits, All Key Statistics Voters and Candidates Should Know