City
Epaper

Mumbai Coastal Road Fully Opens: Marine Drive to Worli, Check Interchange Details Here

By Lokmat English Desk | Updated: January 27, 2025 08:06 IST

Maharashtra Chief Minister Devendra Fadnavis and Deputy CM Eknath Shinde on Sunday, January 26, inaugurated the northbound bridge connecting ...

Open in App

Maharashtra Chief Minister Devendra Fadnavis and Deputy CM Eknath Shinde on Sunday, January 26, inaugurated the northbound bridge connecting the Mumbai Coastal Road with the Bandra-Worli Sea Link. 94% of the work of the has been completed and it will be fully open to Mumbaikars upon the completion of the Prabhadevi connector in February this year.

The coastal road will be open for vehicular movement daily from 7 am to midnight, the Brihanmumbai Municipal Corporation (BMC) had said in a release on Friday, adding the northbound bridge will be opened for the public from January 27.

Also Read | CM Fadnavis inaugurates arch bridge linking Bandra Worli Sea Link to Mumbai coastal road.

The northbound bridge is 827 metres long, with 699 metres over the sea and a 128-metre access road. The bridge includes a 143-metre long, 27-metre wide and 31-metre high ‘Bo Arch String Girder’ weighing approximately 2,400 metric tons, the release said.

Three inter-modal crossings provide convenience to commuters from Worli, Prabhadevi, Lower Parel, Lotus Junction, etc. Motorists in Mumbai can expect some relief from traffic congestion soon as the Worli-Haji Ali section of the Coastal Road is set to see the opening of several key interchanges in phases.

Interchange

From Bindu Madhav Thackeray Chowk towards Bandra.

From the Coastal Road North towards the Prabhadevi exit.

From the North of the Coastal Road towards Bindu Madhav Thackeray Chowk.

At Worli:From Prabhadevi to Marine DriveFrom Prabhadevi to Bandra (using the Vehicular underpass)

At Haji Ali:From the Bandra-Worli Sea Link towards Lotus Jetty/Worli Naka.

At the Haji Ali interchange, six out of eight arms are already operational. The arm connecting Haji Ali Juice Center to Marine Drive now opened to the public.  All four arms of the interchange near Amarsons Garden in Breach Candy are already complete and operational, providing seamless connectivity between Marine Drive and the Sea Link towards Bhulabhai Desai Road and St. Stephens Church.

Tags: Mumbai Coastal RoadMumbai coastal road projectCoastal RoadCoastal Road projectHaji aliMarine Drive
Open in App

Related Stories

MumbaiMumbai’s Transport Gets Major Boost as Maharashtra Govt Unveils Five Key Infrastructure Projects on Independence Day Eve

MumbaiMumbai Coastal Road: Over 4,000 Motorists Fined For Speeding This Year; Rs 31 Lakh Fines Paid So Far

MumbaiGoregaon MTNL Flyover Demolition: Why BMC Is Razing Rs 27 Crore Veer Savarkar Bridge

MumbaiMumbai Traffic: How Will Commuters Be Affected If BMC Demolishes Goregaon’s Veer Savarkar Flyover?

MumbaiMumbai Coastal Road Now Monitored with 236 Smart CCTV Cameras

Mumbai Realted Stories

MumbaiMumbai DRI Busts Mephedrone Manufacturing Unit in Bhopal Linked to Dawood Ibrahim Gang; Three Arrested

MumbaiMumbai Rains: High Tides Reported Under Bandra-Worli Sea Link Bridge (Watch Video)

MumbaiMumbai Rains: City Remains Under Orange Alert Today as Heavy to Very Heavy Rainfall Continues

MumbaiGaneshotsav 2025: Will Larger Artificial Ponds Meet the Growing Demand This Year?

MumbaiMumbai Shock: 17-Year-Old Delivery Boy Shot at Over Online Medicine Payment Dispute