City
Epaper

Mumbai Coastal Road Fully Opens: Marine Drive to Worli, Check Interchange Details Here

By Lokmat English Desk | Updated: January 27, 2025 08:06 IST

Maharashtra Chief Minister Devendra Fadnavis and Deputy CM Eknath Shinde on Sunday, January 26, inaugurated the northbound bridge connecting ...

Open in App

Maharashtra Chief Minister Devendra Fadnavis and Deputy CM Eknath Shinde on Sunday, January 26, inaugurated the northbound bridge connecting the Mumbai Coastal Road with the Bandra-Worli Sea Link. 94% of the work of the has been completed and it will be fully open to Mumbaikars upon the completion of the Prabhadevi connector in February this year.

The coastal road will be open for vehicular movement daily from 7 am to midnight, the Brihanmumbai Municipal Corporation (BMC) had said in a release on Friday, adding the northbound bridge will be opened for the public from January 27.

Also Read | CM Fadnavis inaugurates arch bridge linking Bandra Worli Sea Link to Mumbai coastal road.

The northbound bridge is 827 metres long, with 699 metres over the sea and a 128-metre access road. The bridge includes a 143-metre long, 27-metre wide and 31-metre high ‘Bo Arch String Girder’ weighing approximately 2,400 metric tons, the release said.

Three inter-modal crossings provide convenience to commuters from Worli, Prabhadevi, Lower Parel, Lotus Junction, etc. Motorists in Mumbai can expect some relief from traffic congestion soon as the Worli-Haji Ali section of the Coastal Road is set to see the opening of several key interchanges in phases.

Interchange

From Bindu Madhav Thackeray Chowk towards Bandra.

From the Coastal Road North towards the Prabhadevi exit.

From the North of the Coastal Road towards Bindu Madhav Thackeray Chowk.

At Worli:From Prabhadevi to Marine DriveFrom Prabhadevi to Bandra (using the Vehicular underpass)

At Haji Ali:From the Bandra-Worli Sea Link towards Lotus Jetty/Worli Naka.

At the Haji Ali interchange, six out of eight arms are already operational. The arm connecting Haji Ali Juice Center to Marine Drive now opened to the public.  All four arms of the interchange near Amarsons Garden in Breach Candy are already complete and operational, providing seamless connectivity between Marine Drive and the Sea Link towards Bhulabhai Desai Road and St. Stephens Church.

Tags: Mumbai Coastal RoadMumbai coastal road projectCoastal RoadCoastal Road projectHaji aliMarine Drive
Open in App

Related Stories

MumbaiMumbai Coastal Road Accident: Three Injured After Taxi Collides With Car Near Isha Ambani’s Residence

MumbaiDadar-Coastal Road Tunnel to Open Soon: Major Boost to Traffic Flow at Worli

MumbaiMumbai Shocker: Traffic Warden Dies After Falling Into Sea While Chasing Speeding Tempo on Coastal Road

MumbaiMumbai: Woman Suffers Breathlessness in Coastal Road Tunnel Due to Traffic Jam, BMC Official Comes to Rescue

Navi MumbaiConcerns Rise Over Traffic and Environmental Impact of Kharghar Coastal Road Project

Mumbai Realted Stories

MumbaiMumbai Crime: 47-Year Old Businessman Murdered in Malad Hotel Over Illicit Affair, Woman Arrested from Surat

MumbaiMumbai Rains: Sudden Showers, Thunderstorms and Gusty Winds Bring Relief From Heat; IMD Issues Alerts — Check Latest Weather Update

Mumbai‘Exam Schedule Will Not Be Affected By Mock Drill’: Mumbai University

MumbaiMumbai Crime: 19-Year-Old Girl Killed While Trying to Stop Fight Over Money In Kalyan

MumbaiMumbai Crime News: 72-Year-Old Woman Killed Over Minor Dispute By Neighbour In Malad; Case Registered