City
Epaper

Mumbai Coastal Road: Speed Detection Cameras to Be Installed by May 2025 to Tackle Overspeeding

By Lokmat English Desk | Updated: December 15, 2024 08:56 IST

The Mumbai Coastal Road project, scheduled for full traffic opening in January 2025, will see the installation of speed ...

Open in App

The Mumbai Coastal Road project, scheduled for full traffic opening in January 2025, will see the installation of speed detection cameras completed by May 2025. According to a Free Pres Journal Report, this initiative aims to curb over speeding and enable traffic police to enforce rules against traffic violations. A proposal to install approximately 70 advanced cameras at strategic points is currently awaiting administrative approval.

Presently, the Coastal Road's tunnels are equipped with 154 surveillance cameras, including video incident detection and pan-tilt-zoom cameras, monitoring vehicle movement. Speed limits are set at 80 km/h on open stretches and 60 km/h inside the tunnels. Responding to a request from the Mumbai traffic police, civic authorities have proposed adding speed detection cameras to ensure speed compliance. Initially planned for completion by December, the installation process faced delays.

Residents of South Mumbai have raised concerns about reckless speeding between the tunnel exit and the Bandra-Worli Sea Link, with motorists reportedly turning the stretch into a racing zone.

A senior civic official explained, "The current tunnel cameras can only monitor vehicle movement but cannot penalize speed violations. The upcoming speed detection cameras will automatically capture registration numbers of speeding vehicles, issuing e-challans directly to drivers' mobile phones. This addition was not part of the original plan but was included after the traffic police's request. Installation will begin immediately after receiving approval, with completion expected by May 2025."

The 10.58-km Mumbai Coastal Road extends from the Princess Street Flyover at Marine Drive to the Worli end of the Bandra-Worli Sea Link. It features multi-level interchanges at key locations, including Haji Ali, Peddar Road (Amarsons Garden), and Worli Sea Face. The interchanges at Peddar Road, Haji Ali, and Worli will have four, eight, and six entry-exit arms, respectively.

Tags: Mumbai Coastal Road LeakageMumbai Coastal RoadMumbai NewsMaharashtra NewsmumbaiMaharashtra
Open in App

Related Stories

PunePune Custodial Abuse Row: Supriya Sule Demands Action Over Dalit Women’s Harassment by Police

MumbaiMumbai Local Train Horror: Drunk Cop Harasses Women in Ladies’ Compartment, Snatches Phones When Filmed

MumbaiMumbai Loan App Horror: Woman’s Morphed Nudes Sent to Family Despite Repayment

NashikGanesh Mandals in Nashik Protest Against MSEDCL Over Concessional Rates and Refunds

MumbaiMumbai-Ahmedabad Bullet Train Set to Launch Soon, Confirms Ashwini Vaishnaw

Mumbai Realted Stories

MumbaiMumbai Road Accident: Speeding Tanker Kills Elderly Woman in Andheri; Husband Critically Injured

MumbaiEOW Cracks Down on Mithi River Scam: Two Held, BMC Officials Accused in ₹65.5 Crore Fraud

MumbaiMumbai Local Train Commuter Attacks Railway Staff, Vandalises Office at Borivali Station After Being Caught Without Valid Ticket (VIDEO)

MumbaiMumbai Crime Branch Seizes Rs 25.5 Lakh Worth of Banned E-Cigarettes From Kurla Shops; One Arrested

MumbaiMumbai: After 177 Days, Devotees Bid Farewell to Charkop Cha Raja (Watch Video)