City
Epaper

Mumbai Coastal Road: Viral Video of Patchwork Sparks Outrage Among Motorists

By Lokmat English Desk | Updated: February 20, 2025 15:55 IST

A video of patchwork on the Mumbai Coastal Road’s Northbound stretch near Haji Ali on the bridge towards Worli ...

Open in App

A video of patchwork on the Mumbai Coastal Road’s Northbound stretch near Haji Ali on the bridge towards Worli is viral on social media. A video of the parts with patchwork was recently posted on X by @drifteternal_ .

The user wrote, “This is beyond disappointing. Mumbai’s ₹14000 crore Coastal Road already looks like patchwork. I feel betrayed—this was supposed to be world-class infrastructure. L&T and BMC must be held accountable. Is this what we paid for? #Mumbai #CoastalRoad #InfrastructureFail”

Another user commented on his post that it was an old video to which @drifteternal_ replied that he shot this video yesterday.

Another user commented, “As per BMC , the fact that the coastal road is operational is an achievement. Now we as citizens also want a smooth, patch free road,that is too much to ask from BMC. Our BMC always ensuring that we don't sleep at the wheel by giving us bumpy roads. Always so thoughtful.”

Also Read: Death Threat to Eknath Shinde: Unknown Person Threatens to Blow Maharashtra Deputy CM's Car

On July 10 of last year, the Larsen & Toubro-built section of the road was made accessible to drivers.

"It is a bitumen concrete road which was laid during the monsoons. However, it was discovered a few days ago that the joints between the completed road paving had opened up. Therefore now asphalting was done," stated BMC authorities, verifying the patches on the road.

The southbound route was first opened from Worli to Marine Drive on March 11, 2024. The northbound carriageway was only opened up to Haji Ali on June 10. On July 11, the third opening occurred off the road between Haji Ali and Worli. The northbound connector between the sea link and the coastal road was officially opened on September 12 and traffic began to flow on September 13. On January 26, 2025, the northbound portion of the bridge that connects the sea connection to the coastal road opened.

Tags: Mumbai Coastal RoadMumbai Coastal Road LeakageMumbai coastal road projectHaji aliCoastal RoadL&tBMCMumbai News
Open in App

Related Stories

MumbaiDhurandhar 2 Leaked: Maharashtra Cyber Police Registered Case Over Leak of Aditya Dhar’s Film ‘Dhurandhar - The Revenge’ on Telegram

MumbaiMumbai: 25 Motorcycles Set On Fire in Dharavi; Case Registered

MumbaiMaharashtra Cyber Cell Busts Fake Currency Racket Operated via Instagram; Two Arrested

MumbaiMumbai: Man Sets Fire to Nameplate Near Kirit Somaiya’s Office in Mulund After Gym Dispute; Video Surfaces

MumbaiMumbai Accident: Two Youths Killed, One Critically Injured After Private Bus Rams Bike in Mumbra

Mumbai Realted Stories

MumbaiMaharashtra Cyber Registers FIR Over Viral Obscene Videos Linked to Ashok Kharat

Maharashtra: SSC, HSC Students to Get Marksheet and Certificate in Single Document

MumbaiMumbai Metro Line 9 Phase 1 Opens: Check Fares and Timings

MumbaiMumbai Fire: Blaze Erupts in Sleeper Coach at Matunga Carshed, No Injuries Reported (Watch Video)

MumbaiBombay HC Orders DNA Test of Seafarer Dixit Solanki Killed in Oman Drone Attack