City
Epaper

Mumbai Coastal Road: Viral Video of Patchwork Sparks Outrage Among Motorists

By Lokmat English Desk | Updated: February 20, 2025 15:55 IST

A video of patchwork on the Mumbai Coastal Road’s Northbound stretch near Haji Ali on the bridge towards Worli ...

Open in App

A video of patchwork on the Mumbai Coastal Road’s Northbound stretch near Haji Ali on the bridge towards Worli is viral on social media. A video of the parts with patchwork was recently posted on X by @drifteternal_ .

The user wrote, “This is beyond disappointing. Mumbai’s ₹14000 crore Coastal Road already looks like patchwork. I feel betrayed—this was supposed to be world-class infrastructure. L&T and BMC must be held accountable. Is this what we paid for? #Mumbai #CoastalRoad #InfrastructureFail”

Another user commented on his post that it was an old video to which @drifteternal_ replied that he shot this video yesterday.

Another user commented, “As per BMC , the fact that the coastal road is operational is an achievement. Now we as citizens also want a smooth, patch free road,that is too much to ask from BMC. Our BMC always ensuring that we don't sleep at the wheel by giving us bumpy roads. Always so thoughtful.”

Also Read: Death Threat to Eknath Shinde: Unknown Person Threatens to Blow Maharashtra Deputy CM's Car

On July 10 of last year, the Larsen & Toubro-built section of the road was made accessible to drivers.

"It is a bitumen concrete road which was laid during the monsoons. However, it was discovered a few days ago that the joints between the completed road paving had opened up. Therefore now asphalting was done," stated BMC authorities, verifying the patches on the road.

The southbound route was first opened from Worli to Marine Drive on March 11, 2024. The northbound carriageway was only opened up to Haji Ali on June 10. On July 11, the third opening occurred off the road between Haji Ali and Worli. The northbound connector between the sea link and the coastal road was officially opened on September 12 and traffic began to flow on September 13. On January 26, 2025, the northbound portion of the bridge that connects the sea connection to the coastal road opened.

Tags: Mumbai Coastal RoadMumbai Coastal Road LeakageMumbai coastal road projectHaji aliCoastal RoadL&tBMCMumbai News
Open in App

Related Stories

MumbaiMumbai Local Train Commuter Attacks Railway Staff, Vandalises Office at Borivali Station After Being Caught Without Valid Ticket (VIDEO)

MumbaiMumbai Crime Branch Seizes Rs 25.5 Lakh Worth of Banned E-Cigarettes From Kurla Shops; One Arrested

MumbaiMumbai: After 177 Days, Devotees Bid Farewell to Charkop Cha Raja (Watch Video)

MumbaiMumbai Police File Case Against Three for Assault on 18-year-old Mentally Challenged Girl

MumbaiMumbai: Shiv Sena Protests Outside Congress Office Over Prithviraj Chavan’s Remarks on Malegaon Blast Verdict (VIDEO)

Mumbai Realted Stories

MumbaiMumbai Mega Block on August 3, 2025: Local Train Services to Be Affected in Central, Western and Harbour Lines on Sunday

MumbaiMumbai Police Registers First FIR in Mahim for Feeding Pigeons Following BMC Complaint

MumbaiIIT Bombay Student Dies by Suicide After Jumping from Hostel Terrace in Mumbai

MumbaiMumbai: Key Accused in Sajid Electricwala Kidnapping Case Escapes to Dubai; 13 Arrested So Far

MumbaiMumbai: EOW Submits Chargesheet in Rs 65-Crore Mithi River Cleaning Scam; Two Arrested, 11 Accused Still at Large