City
Epaper

Mumbai Local Train Update: Trains Running 15–20 Minutes Behind Schedule in Central Line Due to Signal Glitch

By Lokmat English Desk | Updated: February 4, 2025 09:52 IST

Local train services on the Central Railway’s main line were disrupted on Tuesday morning due to a technical snag ...

Open in App

Local train services on the Central Railway’s main line were disrupted on Tuesday morning due to a technical snag in the signalling system near Mumbai. Suburban trains considered the lifeline of Mumbai, were running late by at least 15-20 minutes due to the problem that occurred on the south-bound slow track between Diva and Mumbra railway stations in the neighbouring Thane district of Maharashtra at 4.55 am, reported the news agency PTI quoting official.

Central Railway’s (CR) Chief Public Relations Officer Swapnil Nila said the signal was set right at around 6 am, more than one hour after the snag developed. Owing to the disruption, crowds swelled on the CR’s suburban trains and stations on the main line.

Also Read | Mumbai Local Train Update: Services Set to Increase by 10 Percent, Total to Exceed 3,500.

A commuter activist said passengers faced hardships as a result. The CR's main line stretches from Chhatrapati Shivaji Maharaj Terminus in south Mumbai to Kasara in Thane and to Khopoli and Karjat in Raigad district.

The Central Railway operates nearly 1,800 local services daily on its suburban railway network. More than 35 lakh commuters travel on the local trains daily on its main, harbour, trans-harbour, and Belapur-Uran suburban corridors.

Tags: Mumbai Local Train UpdateCentral LineMumbraThanemumbai
Open in App

Related Stories

MumbaiMumbai Local Train News: City To Get India’s First Non-AC ‘Closed-Door’ Local

MumbaiMumbai: Fire Breaks Out at Terminal 1 of Chhatrapati Shivaji International Airport; No Injuries Reported (Watch Video)

ThaneThane: Retired Police Officer Booked for Assault and Misconduct in Kalyan Residential Society

MumbaiMumbai Local Train Update: Virar–Dadar Fast Train Skips Bhayandar Stop, Leaves Commuters Stranded

ThaneThane Road Accident: Two Killed, One Injured as Trio on Two-Wheeler Hit by Bus in Mumbra

Mumbai Realted Stories

MumbaiDaylight Heist in Kurla: Jeweller Duped of ₹15 Lakh by Fake Cops in Filmy-Style Robbery

MumbaiGujarat Drug Trafficker Busted in Mumbai, Multi-Crore Synthetic Drug Racket Exposed

MumbaiLadki Bahin Yojana: Stop Scheme If No Funds for Pension, Says Bombay HC

MumbaiMumbai Songwriter Duped of ₹3.25 Lakh on Pretext of Work with Singer Kailash Kher

MumbaiMumbai Traffic Police Crack Down on Violators; ₹7.72 Crore Fine Collected in a Month