City
Epaper

Mumbai Metro 7: Rates for 'Mumbai Metro 7' fixed! Said by MMRDA.

By Lokmat English Desk | Updated: March 2, 2022 17:01 IST

Mumbai Metrol 7: The Mumbai Metro Development Authority (MMDA) has almost fixed the ticket prices for the upcoming Mumbai ...

Open in App

Mumbai Metrol 7: The Mumbai Metro Development Authority (MMDA) has almost fixed the ticket prices for the upcoming Mumbai Metrol 7. The minimum fare for Mumbai Metro 7 will be Rs 10, MMRDA Commissioner S.V. R. Given by Srinivas. Metro transport between Dahisar to Aarey Colony will be started on this route.

Work on Metro 7 is nearing completion. After getting all the necessary permits and certificates required to start passenger transport through Mumbai Metro 7, Mumbai Metro will be launched in a month. Srinivas informed that in the first phase, Metro 7 and 2A will jointly start the 20-kilometer route. The second phase of the route will be 15 km long and we will start a 35 km metro line, he said. Metro 2A is also in the final stages. He said that Phase 1 traffic on this route will be started along with 'Mumbai Metro 7' Metro.

Equipped with 10 metro trains and manpower

A total of 10 metro trains will be used for the first phase of ‘Metro 2A’ and ‘Metro 7’. The testing of these vehicles has been going on for the last several months. So now the safety test of these vehicles has been completed. So now these trains are ready to run with passenger capacity. On the other hand, in the first phase, the responsibility of management and operation of the metro has been entrusted to an independent body. The MMRDA-run mechanism has provided the required manpower. Their training has also been completed and the staff is ready to serve.

The route will be Metro 2A Metro 2A is 18.5 km long. There will be Metro 2A route from Dahisar West to DN Nagar station. This route includes Dahisar East, Upper Dahisar, Kanderpada, Mandpeshwar, Eksar, Borivali (West), Shimpoli, Kandivali (West), Dhanukarwadi, Valanai, Malad (West), Lower Malad, Pahadi Goregaon, Goregaon (West), Oshiwara, Lower Oshiwara. And DN Nagar will be such stations.

Stations on Metro-7 route There will be 14 stations on the Metro-7 route. Dahisar East, Overipada, Sanjay Gandhi National Park, Devipada, Magathane, Poisar, Akurli, Kurar, Dindoshi, Aarey, Goregaon East (Mahanand Dairy), Jogeshwari East (JVLR Junction), Shankarwadi, Gundwali (Andheri East).

Tags: Mumbai Metromumbai
Open in App

Related Stories

CricketVijay Hazare Trophy 2025–26: Sarfaraz Khan’s 150 and Mushir’s Half-Century Power Mumbai to 444/8

MumbaiMumbai Metro One Adds Additional Train Services Between Versova and Ghatkopar on New Year Eve

MumbaiLast Sunrise of 2025 Video: Mumbaikars Witness Golden Dawn at Gateway of India

MumbaiMumbai Faces Poor Air Quality; Residents Urged to Limit Outdoor Exposure

MaharashtraWork with Sena (UBT) to Save Mumbai: Raj Thackeray Asks Party Workers to Keep Differences Aside

Mumbai Realted Stories

MumbaiBMC Election 2026: Over 2,500 Candidates File Nominations as Deadline Ends

NationalNew Year 2026 Wishes Scam Alert: Downloading APK Files Through WhatsApp Links Can Steal Your Data; Cyber Expert Shares Tips

MumbaiNew Year's Eve 2025: Maharashtra Govt Extends Operating Hours for Hotels and Bars

MumbaiMumbai: 21-Year-Old Killed in Eastern Express Highway Crash After Returning Home from Friend’s Birthday Celebration

MumbaiMumbai New Year 2026 Celebration: Local Trains, Metro Line 3, and BEST Buses To Run All Night on December 31