City
Epaper

Mumbai Metro Line 3: Final Phase to Open on 8th October for Commuters – Key Details Inside

By Lokmat Times Desk | Updated: October 7, 2025 12:51 IST

Mumbai Metro Line 3 (Aqua Line) is all set to open its final phase on October 8 (Wednesday). The ...

Open in App

Mumbai Metro Line 3 (Aqua Line) is all set to open its final phase on October 8 (Wednesday). The line runs from Science Centre in the north to Cuffe Parade in the south, covering 11 key stations in South Mumbai. It will be the city’s first underground metro line, also known as the Colaba-Bandra-Seepz line. The first stretch of Mumbai Metro Line 3 was inaugurated in October last year, connecting Bandra-Kurla Complex (BKC) to Aarey. The latest extension links business hubs, residential areas, and prominent historical landmarks. The fully operational Aqua Line spans 33.5 km from Aarey Colony in the north to Cuffe Parade in the south, featuring 27 stations, all underground except the Aarey depot.

Aqua line route

Metro 3, aqua Line is a 33.5 km corridor which will connect Aarey Colony in the North to Cuffe Parade in the South. This route will have 27 stations, which are build underground line runs entirely underground, except for the Aarey Depot. This route will also integrate the Metro with the existing transport network, including stops at Mumbai Central, CSMT Metro and Churchgate for the suburban railways and Marol Naka for Metro Line 1. This route will also have  direct connectivity to the Domestic (T1) and International (T2) Airports.

Key Station Includes 

  1. Nehru Science Centre
  2.  Mahalaxmi
  3.  Mumbai Central
  4.  Grant Road 
  5. Girgaon 
  6. Kalbadevi
  7.  CSMT 
  8.  Hutatma Chowk
  9.  Churchgate
  10.  Vidhan Bhavan
  11. Cuffe Parade

Based on the distance, Mumbai metro line 3 fare structure will be affordable for the commuters, estimated price is as follow.

  1. Up to 3km:  Rs. 10
  2. Between 3Km to 12 km: Rs 20.
  3. For 18-24 km: Rs 40
  4. for 24-30 km:  Rs 50 
  5. for 30-36 km: Rs 60

As per the reports max fare will be capped at Rs 80 excluding Metro 3. Passengers can pay using the National Common Mobility Card (NCMC), Paper QR codes, or WhatsApp e-tickets. Aqua Line, expected to serve over 1.7 million passengers daily, is a vital infrastructure project that will improve North-South connectivity and reduce strain on the financial capital's transportation networks.

Tags: Mumbai Metro Line 3Aqua LineWorliCuffe paradeMaharashtra News
Open in App

Related Stories

MumbaiMumbai One App: One-Stop Mobility Solution for Metro, Monorail, Suburban Trains, and Buses – Check Details Here

Navi MumbaiNavi Mumbai Airport Inauguration: When Will Flights Begin, Which Airlines Will Operate, and How Will Digital Check-Ins Ease Travel?

MumbaiMumbai Coastal Road Accident: Speeding Car Plunges Into Arabian Sea Near Worli, Driver Rescued by MSF Personnel

Navi MumbaiNavi Mumbai Airport Inauguration: Traffic Advisory Issued For October 8 Ahead Of PM Modi's Visit, Check Details

MumbaiMumbai Coastal Road Safety in Spotlight: BMC Plans Special Speed Bumps to Curb Accidents

Mumbai Realted Stories

NationalDiwali 2025: When to Celebrate Deepavali – October 20 or 21? Check Lakshmi Puja Muhurat, Amavasya Tithi, and Other Details

MaharashtraPalghar: 14-Year-Old Girl Alleges Forced Marriage, Rape and Abortion; Six Booked Under POCSO

MumbaiMumbai: Builder’s ‘Kidnapping’ Turns Out to Be Rehab Admission Drama in Andheri; Police Expose Truth Behind Late-Night Panic

MumbaiMumbai-Thane Water Cut News: Supply To Be Disrupted From Today Till October 9; Check Affected Areas

MumbaiMumbai: 42-Year-Old Man Arrested for Molesting His Minor Niece on Street in Khar