City
Epaper

Mumbai-Nashik Highway Traffic: New Rules for Heavy Vehicles and Roads To Be Potholes Free

By Nirmeeti Patole | Updated: July 24, 2024 13:27 IST

In a crucial meeting at the Thane District Collector's office, Maharashtra's Public Works Minister Dadaji Bhuse outlined a comprehensive ...

Open in App

In a crucial meeting at the Thane District Collector's office, Maharashtra's Public Works Minister Dadaji Bhuse outlined a comprehensive plan to tackle severe traffic congestion on the Mumbai-Nashik highway. The strategy addresses both immediate relief and long-term solutions for a 23 km stretch from Vadape to Thane and a 97 km stretch from Nashik to Vadape. Bhuse demanded significant progress within 8 days and warned officials of consequences for delays.

Key Decisions and Action Points:

  • Road Repairs: Immediate attention to be given to pothole repairs along the entire stretch, with a focus on durable solutions to prevent recurrence.
  • Bridge Works: Expediting ongoing bridge construction and repair works, including the flyover near Jindal company and the bridge near Parivar garden.
  • Asangaon Railway Bridge: With work on the new bridge to take next 3 months, a decision was made to repair the existing bridge to ease traffic flow.
  • Traffic Management: 
  1. Implementation of lane discipline: Heavy vehicles to use the second and third lanes, keeping the first lane open for lighter vehicles.
  2. Deployment of 170 police assistants from Thane to Wadape to aid traffic control.
  3. Time restrictions to be imposed on heavy vehicle movement within city limits•Samruddhi Mahamarg Connection: Discussions held on improving the road connecting to the Samruddhi Mahamarg near Igatpuri.•Strict Timeline: Minister Bhuse emphasized that positive results should be visible on the ground within 8 days.•Accountability: Senior officials in charge of areas not showing improvement will face action.

 

Minister Bhuse told LokmatTimes.com, "We are implementing a multi-pronged approach to tackle this issue. From immediate repairs to long-term infrastructure improvements, every aspect is being addressed." The minister also made a public appeal for cooperation, urging citizens to play their part in easing the traffic situation.The persistent gridlock has been causing significant distress to travelers, particularly those heading towards Bhiwandi, Thane, and Mumbai. Local industrialists and business owners have also reported substantial economic losses due to the ongoing traffic issues.

Tags: Mumbai-Nashik highwayMumbai NewsDadaji bhuse
Open in App

Related Stories

EntertainmentMumbai Actress Gayatri Datar Accuses Cab Driver of Harassment After Pune Booking, Slams App Support

MumbaiMumbai Metro Line 3 Introduces Discounted Passes for Students and Tourists; Check Rates

MumbaiMumbai Local Train Update: Virar–Dadar Fast Train Skips Bhayandar Stop, Leaves Commuters Stranded

CricketMumbai: Smriti Mandhana–Palash Muchhal Reunion Rumours Ignite After Viral Restaurant Video

MumbaiMumbai Car Loan Scam: Fake Recovery Agents Chase Man for Alleged EMI Dues of Vehicle on Eastern Express Highway

Mumbai Realted Stories

MaharashtraChhatrapati Sambhajinagar: ACB Catches School Headmistress Red-Handed in Bribery Case

PunePune Shocker: Man Beats Hotel Manager for Asking to Settle Food Bill, Case Registered

MaharashtraDharashiv: Gas Agency Distributor Attempts Suicide During Online Meeting Over Financial Stress

MaharashtraSunetra Pawar Set to Win Baramati Assembly By-Poll As Congress Withdraws Candidate

MaharashtraParth Pawar Takes Oath As Rajya Sabha MP, Wears Father Ajit Pawar’s Pink Jacket