City
Epaper

Commuters disgruntled with concretisation of road

By Lokmat English Desk | Updated: January 9, 2024 09:35 IST

Nashik, JAN 8The Mahalakshmi Temple Road in the Deolali Camp, which is 213-metre long and 3-metre wide has ...

Open in App

Nashik, JAN 8

The Mahalakshmi Temple Road in the Deolali Camp, which is 213-metre long and 3-metre wide has been concretised by the Cantonment Board. However, local residents are expressing dissatisfaction with this development as the newly constructed road still appears to be quite narrow.

The construction of more than 1,000 houses is going on in ward number four of the Cantonment Board. Since the Cantonment administration has constructed a road which is only 10 feet wide, commuters here are facing inconvenience.

As the road has now become narrow and stones are present on both sides of the concrete road, many accidents are taking place here. Although the Cantonment Board has constructed the road, drivers are facing inconvenience. It is necessary to address this issue promptly to avoid accidents, say commuters.

08Rasta

Open in App

Related Stories

TechnologyNo talks with Iran on Hormuz transit levy, reports baseless: Govt

BusinessIMF tells Pakistan to remove subsidy on fuels

BusinessNo talks with Iran on Hormuz transit levy, reports baseless: Govt

BusinessAbrupt petrol price cut after hike in Pak reflects a deeper policy failure: Report

NationalIMF tells Pakistan to remove subsidy on fuels

Nashik Realted Stories

NashikAshok Kharat Case: ED Investigates Financial Links, No One Will Be Spared, Says CM Fadnavis

NashikNashik Shocker: Man Arrested After Allegations of Sexual Exploitation, 121 Clips Recovered

NashikNashik Water Cut: Supply to Remain Shut Across City From Today for Repair Work

NashikNashik Car Accident: 9 of Family, Including 5 Children, Die After Car Falls Into Well in Dindori

MaharashtraAshok Kharat Case: Son’s Shocking Confession Exposes Black Money Empire as SIT Probe Intensifies