City
Epaper

Nashik Power Cut: City To Experience Electricity Shutdown From May 15–18; Check Details

By Chitra | Updated: May 15, 2024 16:05 IST

Residents of various areas falling under the CIDCO sub-division of Nashik City Division 1 will experience temporary electricity supply ...

Open in App

Residents of various areas falling under the CIDCO sub-division of Nashik City Division 1 will experience temporary electricity supply disruptions from May 15 to May 18, 2024. The scheduled power outages will occur daily between 8:00 AM and 4:00 PM. These interruptions are essential to facilitate maintenance and repair work on multiple electrical channels and systems. Activities during this period will include clearing tree branches encroaching on the electrical infrastructure and conducting other crucial maintenance tasks.

The City Division 1 of Mahavitran has requested consumers to be patient and cooperative during these essential maintenance activities. The specific areas and dates affected are as follows:

May 15:

  • 11 K.V. Pratap Chowk
  • Pangremala
  • Kuber Lanes
  • Water Tank and premises on Govindnagar Electricity Channel

May 16:

  • 11 K.V. Rana Pratap Chowk
  • Audumber Bus Stop
  • Prabhat Colony
  • State Bank
  • Life Care Hospital
  • Shivaji Bhaji Market
  • Burkule Nagar
  • Pangre Mala
  • Localities on Lekhanagar Vidyut Vahini

11 K.V. Vishwas Bank

  • Chandravel
  • Sunil Medical
  • Sharda Niketan
  • Indiranagar Tunnel
  • Datta Tire
  • Localities on Prakash Vidyut Vahini

May 17:

  • 11 K.V. Ganapati MandirSagar Suite
  • Manohar Nagar
  • Sadguru
  • Sadashiv Nagar
  • Church Line
  • Kashikonagar
  • Localities on Sadguru Nagar Vidyut Vahini
  • 11 K.V. BSNL Chowk on Pimprikar Vidyut Vahini
  • Pimprikar Hospital
  • Patil Classic
  • Reliance Apartments
  • Ashwini Hospital
  • Jogging Trunk and premises

May 18:- 33 K.V. Ambad MIDC- Marigo Building- Upendra Nagar- Uttam Nagar College- Mahakali Chowk and surroundings on CIDCO Electricity Channel

Mahavitran has said the importance of these maintenance activities to ensure a more reliable and efficient electricity supply in the future. Residents and businesses in the affected areas are advised to plan accordingly and take necessary precautions to mitigate the inconvenience caused by these power outages. Your cooperation and understanding are greatly appreciated.

Tags: Maharashtra NewsNashikPower Outage
Open in App

Related Stories

PunePimpri Chinchwad Men Threaten to Throw Child Off Building During PCMC Anti-Encroachment Drive (Watch Video)

PunePune: 3 Workers Trapped After Soil Collapse During Drainage Work in Nanded City (Watch Video)

MumbaiMumbai: Badminton Coach Brutally Stabbed for Refusing ₹1,000 Extortion in Chembur

NashikNashik: Notices Sent to Developers Amid NMC-MHADA Dispute; Clarifications Sought on 20% Housing Rule

MumbaiMaha Mumbai Metro Crosses 20 Crore Passenger Journeys on Lines 2A and 7 in Just 39 Months

Nashik Realted Stories

ThaneThane Fire Acccident: Container Catches Blaze on Patlipada Flyover, No Casualties Reported (Watch Video)

MumbaiMumbai: One Dead, Three Injured Due to Autorickshaw Driver’s Reckless Driving; Case Registered

MumbaiMumbai: 25-Year-Old Man Sleeping on Footpath Run Over by Mercedes Babulnath Area

NashikNashik: Two Minors Detained for Murder After Allegedly Beating Classmate To Death

MaharashtraGovt. Diverts Rs 410 Crore from Social Justice Fund to Ladki Bahin Yojana, Raises Concerns Over Policy Breach