City
Epaper

Centre issues guidelines for 'model solar village’ under PM-Surya Ghar scheme

By IANS | Updated: August 12, 2024 15:20 IST

New Delhi, Aug 12 The Union government has released guidelines for the implementation of a ‘model solar village’ ...

Open in App

New Delhi, Aug 12 The Union government has released guidelines for the implementation of a ‘model solar village’ under PM-Surya Ghar: Muft Bijli Yojana, the Ministry of New and Renewable Energy said on Monday.

The scheme guidelines notified by the Ministry of New and Renewable Energy lays emphasis on creating one model solar village per district across India.

This is aimed at promoting solar energy adoption and enabling village communities to become self-reliant in meeting their energy needs, the ministry said.

“A total financial outlay of Rs. 800 crore has been allocated for this component, providing Rs 1 crore per selected model solar village,” it added.

Launched on February 29, with an outlay of Rs. 75,021 crore, the PM Surya Ghar: Muft Bijli Yojana aims to increase the share of solar rooftop capacity and empower residential households to generate their own electricity.

To be selected, a village must have a revenue with a population size above 5,000 (or 2,000 for special category states).

The selection process involves a competitive mode where villages are assessed on their overall distributed renewable energy capacity installed six months after the declaration of the potential candidate by the District Level Committee (DLC).

After the identification of these villages, the competition period shall start, and an extensive mobilisation exercise including reaching out door to door to prospective beneficiaries of the scheme.

It will be carried out in these villages under the leadership of the respective Panchayats.

“The village with the maximum overall renewable energy capacity deployed within its revenue boundaries as per the assessment exercise, (achieved with or without governmental scheme support), shall be selected as the model solar village for the District,” the ministry said.

Once selected, the State Renewable Energy Development Agency shall act as the Model Solar Village Implementing Agency (MSVIA).

It will then develop a detailed project report for transitioning the village to a solar-powered village, the ministry said.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Open in App

Related Stories

AurangabadEngineering student sexually assaulted on pretext of marriage; youth booked

AurangabadBurglary at hardware store; goods worth Rs 59,000 Stolen

AurangabadMan attacked by wife and in-laws over money dispute; struck with cutter, bitten

AurangabadHeight of recklessness! 412 motorists drive wrong-way, 164 triple-seated riders fined in three hours

AurangabadSafflower oil hits Rs 325 per Kg but farmers still avoid cultivating it

National Realted Stories

NationalIndia plans Rs 65,400 crore push to build its own fighter jet engines by 2035

NationalLadakh LG calls on Defence Minister, discusses humanitarian assistance & air connectivity for UT

NationalBetting racket: ED seizes Rs 35.80 crore parked in 300 bank accounts

NationalPM Modi Condoles Loss of Lives in Jaipur Accident, Announces Rs 2 Lakh Ex Gratia for Next of Kin of Each Deceased

NationalBihar polls: Delhi CM Rekha Gupta to campaign for 3 days from tomorrow