City
Epaper

First train set of India's first Regional Rapid Transit System is ready, to be handed over on May 7

By ANI | Updated: May 5, 2022 22:05 IST

The first train set of India's first Regional Rapid Transit System (RRTS) corridor is ready and will be handed over to National Capital Region Transport Corporation (NCRTC) on May 7.

Open in App

The first train set of India's first Regional Rapid Transit System (RRTS) corridor is ready and will be handed over to National Capital Region Transport Corporation (NCRTC) on May 7.

Under the Make in India initiative, 100 per cent of these state-of-the-art RRTS train sets are being manufactured in India, at the Alstom's factory, earlier known as Bombardier, in Savli, Gujarat, where the keys of the RRTS trainsets will be handed over to NCRTC.

After the handing over of the train sets to NCRTC by Alstom, these trainsets will be brought on the large trailers to the Duhai depot being developed at Ghaziabad at a rapid pace for the Delhi-Ghaziabad-Meerut RRTS corridor.

The interiors along with the commuter-centric features of India's first RRTS trains have recently unveiled on March 16, at the Duhai Depot, Ghaziabad.

These RRTS trains will be the fastest trains in India with a design speed of 180km/h, an operational speed of 160km/h and an average speed of 100 km /h.

The modern RRTS trains will have ergonomically designed 2x2 transverse cushioned seating, wide standing space, luggage racks, CCTV cameras, laptop and mobile charging facility, dynamic route maps, auto control ambient lighting system, and Heating Ventilation and Air Conditioning System (HVAC) and other amenities.

The air-conditioned RRTS trains will have standard as well as one coach of Premium class per train along with one coach reserved for women commuters.

The manufacturing facility at Savli will be delivering a total of 210 cars for the first RRTS corridor.

This includes trainsets for operating regional transit services on the Delhi-Ghaziabad-Meerut corridor and for local transit services in Meerut.

The construction work on the RRTS corridor is going on in full swing. After the arrival of the trains, initial trial runs are expected to commence on the priority section by the end of this year.

The 17 km Priority Section, between Sahibabad to Duhai, is targeted to be commissioned by 2023 and the full corridor by 2025.

( With inputs from ANI )

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: indiaGhaziabadNational capital region transport corporationAlstomIndiUk-indiaUttar pradesh the railwaysRepublic of indiaIndia indiaGia india
Open in App

Related Stories

NationalGhaziabad Man Dies After Dispute With In-Laws Turns Violent During ‘Reconciliation’ Attempt

InternationalIranian President Calls for Constructive Role of Brics to Halt West Asia Conflict During Talks With PM Modi

NationalGhaziabad Power Cut Today : Electricity Supply To Be Affected in Following Areas on March 20, 2026; Check Timing

LifestyleEid 2026 Date: When Will Saudi Arabia, UAE and India Celebrate Eid-ul-Fitr?

MaharashtraMaharashtra CM Devendra Fadnavis Unfurls 200-Foot National Flag at Nagpur’s Kasturchand Park

National Realted Stories

NationalAdani tells US judge to dismiss SEC fraud suit against him as case 'legally flawed'

NationalRubio blames Iran for global shipping crisis

NationalBJP chief in parleys with state CMs, state heads and seniors over Women Reservation Act

NationalMaha Minister stresses safety, verification of gig workers

NationalAssam BJP leaders file police complaint against Congress President Kharge over 'snake' remarks