City
Epaper

Haryana CM reviews progress of 8 Namo Bharat corridor projects in NCR

By IANS | Updated: May 6, 2025 18:07 IST

Chandigarh, May 6 Haryana Chief Minister Nayab Singh Saini, on Tuesday, reviewed the progress of eight Namo Bharat ...

Open in App

Chandigarh, May 6 Haryana Chief Minister Nayab Singh Saini, on Tuesday, reviewed the progress of eight Namo Bharat corridor projects in the National Capital Region (NCR) under which three corridors are currently under implementation in first phase, officials said.

These are Delhi-Ghaziabad-Meerut (82 km), Delhi-Gurugram-Shahjahanpur-Neemrana-Behror (SNB) (105 km) and Delhi-Panipat-Karnal (136 km) routes.

During the meeting, the Chief Minister emphasised the transformative potential of the Namo Bharat corridors (Regional Rapid Transit System) in easing traffic congestion, boosting regional connectivity, and enhancing economic development across urban and semi-urban areas of the state.

He instructed officials to expedite approvals for the Delhi-SNB and Delhi-Karnal projects to ensure their timely completion.

During the meeting, a detailed presentation was made by National Capital Region Transport Corporation (NCRTC) Managing Director Shalabh Goel on detailed project reports, highlighting the features of the two Namo Bharat corridors.

The meeting was told that the Delhi-Ghaziabad-Meerut RRTS corridor has achieved significant milestones, with successful operations on a 55-km section and positive public response.

Chief Minister Saini suggested the design of the Namo Bharat corridors should be future-ready and efficient integration with metro systems should be ensured for enhancing the utility of the system.

The Chief Minister reviewed the alignment, stations and land requirements related to the Delhi-Gurugram-SNB and Delhi-Panipat-Karnal corridors.

He instructed departments to provide necessary support to NCRTC to ensure early start of projects.

He also reviewed the alignment of the proposed Gurugram-Faridabad-Noida Namo Bharat corridor and directed officials to provide necessary approval and support to NCRTC for preparation of the detailed project report.

The Namo Bharat train ensures high speed connectivity, covering 90 km distance in about one hour.

It will reduce the travel time between Ghaziabad and Gurugram from 100 minutes by road to just 37 minutes.

It will also provide fast and direct access to the Delhi airport from Haryana.

The Namo Bharat train has a maximum design speed of 180 km per hour with an inter-station distance of 5 to 10 km and train frequency of every 5 to 10 minutes.

It will also have platform screen doors and automatic fare collection system.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Open in App

Related Stories

TechnologyNo more obstacles in case of NSE IPO: SEBI Chairman

EntertainmentGuru Randhawa unveils new track ‘From Ages’ on World Music Day

EntertainmentHitesh Bhardwaj: ‘Aami Dakini’ is layered, emotional, and quietly intense

BusinessNo more obstacles in case of NSE IPO: SEBI Chairman

National‘Stick to facts, not fake headlines’: BJP on Congress claim that Black Money in Swiss banks has tripled

National Realted Stories

NationalYoga is priceless gift from sages, says Himachal Guv

NationalBengal to implement multi-level checks before uploading birth certificates online

NationalDGCA directs Air India to remove 3 officials without delay, airline implements order

NationalBihar joins nation in celebrating 11th International Day of Yoga with enthusiasm, unity

NationalVijay Shah advocates weekly yoga sessions in MP's Khandwa to restore social harmony