City
Epaper

Hyderabad Metro to resume services from September 7

By ANI | Updated: September 6, 2020 00:25 IST

Preparations are underway at the metro stations of Hyderabad Metro as it gears up to resume services from September 7 as part of unlock 4.

Open in App

Preparations are underway at the metro stations of Hyderabad Metro as it gears up to resume services from September 7 as part of unlock 4.

Informing about the same, N.V.S Reddy, Managing Director of Hyderabad Metro Rail Limited said, "Metro operations will be resumed in a graded manner from September 7 onwards following Hyderabad metro rail services Broad Guidelines and Standard Operating Procedures (SOPs). The frequency of trains will be around 5 minutes. It will be increased or decreased based on passenger traffic and to avoid crowding,"

He added that in order to ensure social distancing, suitable markings at stations and inside trains are being done for passengers to stand, and alternate seats in the train will be marked with a cross to keep it vacant.

"Wearing a face mask is mandatory for all passengers and staff. A suitable penalty as per regulation shall be imposed for any violation. There will be thermal screening at the entrance, and only asymptomatic people will be allowed to travel in the metro rail," he said.

Reddy added that pedal type stizers will be kept at the entry of the stations for passengers, and stations will be disinfected thoroughly during non - working hours in the night.

There will also be a counter from where one can purchase masks.

"Smart Card and Mobile QR ticket with cashless transactions will be encouraged. Train doors will remain open at terminal stations to let fresh air inside in the train," he added.

Reddy said that the use of the Arogya-Setu App would be encouraged among passengers with smartphones.

( With inputs from ANI )

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: Hyderabad Metro Rail LimitedMetroMetro.co.uk
Open in App

Related Stories

NationalJaipur Metro: Policeman Saves Woman and Child After Escalator Slip, CCTV Surfaces

MumbaiMetro 9 Draws Crowds While Line 2B Runs Nearly Empty on Opening Day

MumbaiMumbai Metro Line 9 Phase 1 Opens: Check Fares and Timings

MumbaiMumbai Metro Line 3 to Get Tokyo-Style Underground Walkways, Boosting Connectivity in BKC and Worli

PunePune Metro: Illegal Borewell Digging Damages Underground Tunnel in Shukrawar Peth, Case Registered Against Owner and Contractor

National Realted Stories

NationalAir Chief Marshal Singh receives Guard of Honour in Sri Lanka, pays tribute to IPKF martyrs

NationalJharkhand: Body of missing Class 11 girl found near riverbank in Giridih, probe underway

National14 Trinamool MLAs get invite for CM Adhikari's administrative review meeting in North Bengal

NationalPM Modi hails global appeal of Indian classical dance after five Italian women perform

NationalHyderabad Crime: 25-Year-Old Spa Worker Brutally Murdered by Husband