City
Epaper

India to scale nuclear capacity to reach 100 GW by 2047: Report

By IANS | Updated: April 11, 2026 14:25 IST

New Delhi, April 11 India has set a major target to scale up its nuclear power capacity to ...

Open in App

New Delhi, April 11 India has set a major target to scale up its nuclear power capacity to at least 100 GW by 2047, marking the centenary of its independence, as it looks to strengthen long-term energy security and reduce dependence on fossil fuels, according to a new report.

As per a report by Khaleej Times, the country currently operates 24 nuclear reactors with a combined capacity of 8,780 MWe (Megawatt electric), while eight more reactors with a capacity of 6,028 MWe are under construction.

Government projections indicate that installed nuclear capacity will rise to around 22 GW by the early 2030s before expanding sharply to meet the 100 GW target.

To achieve this more than eleven-fold increase, India is pursuing a two-pronged strategy that includes the development of large reactors — such as indigenous 700 MWe pressurised heavy water reactors (PHWRs) and imported large-capacity units at greenfield sites — alongside smaller modular systems like the 200 MWe Bharat Small Modular Reactors (BSMRs) and 55 MWe SMR-55 units, the report said.

A key milestone in this journey was achieved on April 6, 2026, when the 500 MWe Prototype Fast Breeder Reactor (PFBR) at Kalpakkam in Tamil Nadu attained first criticality — the start of a controlled nuclear fission chain reaction.

The development is being seen as a major step in advancing India’s indigenous nuclear technology and ensuring long-term fuel sustainability.

India’s nuclear programme is built around a three-stage strategy designed to maximise limited uranium resources while leveraging its vast thorium reserves.

The first stage uses PHWRs fuelled by natural uranium to produce plutonium. The second stage involves fast breeder reactors that use plutonium as fuel and generate more fissile material than they consume. The final stage aims to utilise thorium-based reactors, producing uranium-233 to sustain long-term nuclear power generation.

According to the report, the PFBR uses uranium-plutonium mixed oxide (MOX) fuel and liquid sodium as a coolant, enabling it to produce more fuel than it consumes while paving the way for eventual thorium use.

The 500 MWe reactor is capable of supplying electricity to around half a million homes.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Open in App

Related Stories

AurangabadGraduation Ceremony held MP Law College

CricketCSK vs DC LIVE Cricket Streaming: When and Where To Watch Chennai Super Kings vs Delhi Capitals IPL 2026 Match

Other SportsSub-Jr Hockey Nationals: MP to face UP in Men’s final; take on Jharkhand in women’s summit clash

NationalArmy’s White Knight Corps launches 100‑day anti‑drug campaign in J&K

AurangabadAnnual award function at BFCI English School

National Realted Stories

NationalAmerica lost, Iran won; Pakistan is a puppet of the US, says native of Khomeini's village

NationalGujarat only state to implement 19 industry-specific policies, says State BJP chief

NationalPM Modi, Rahul Gandhi share rare brief exchange at Parliament amid earlier tensions

NationalUpendra Kushwaha claims 'Nitish model' to run in Bihar post Nitish Kumar's resignation

NationalGovt committed to empowering farmers, rural economy: Maha Minister