City
Epaper

Indian Railways commissions first waste to energy plant in Bhubaneswar

By ANI | Updated: January 28, 2020 22:45 IST

Indian Railways has commissioned the country's first governmental waste to energy plant in Mancheswar Carriage Repair workshop at Bhubaneswar under the East Coast Railway zone.

Open in App

Indian Railways has commissioned the country's first governmental waste to energy plant in Mancheswar Carriage Repair workshop at Bhubaneswar under the East Coast Railway zone.

Member, Rolling Stock, Rajesh Agarwal inaugurated the plant on January 22 along with GM, East Coast Railway. The Waste to Energy Plant, having a capacity of 500 kilogram waste per day has been constructed in three months.

"This Waste to Energy Plant, a patented technology called POLYCRACK, is first-of-its-kind in Indian Railways and fourth in India. It is the world's first patented heterogeneous catalytic process which converts multiple feedstocks into hydrocarbon liquid fuels, gas, carbon and water," said the Ministry of Railways in a statement.

"Polycrack plant can be fed with all types of plastic, petroleum sludge, un-segregated MSW (Municipal Solid Waste) with moisture up to 50 per cent, e-waste, automobile fluff, orgc waste including bamboo, garden waste, etc., and jatropha fruit and palm bunch. Waste generated from Mancheswar Carriage Repair Workshop, Coaching Depot and Bhubaneswar Railway Station will be feeder material for this plant," further reads the statement.

"The process is a closed-loop system and does not emit any hazardous pollutants into the atmosphere. The combustible, non-condensed gases are re-used for providing energy to the entire system and thus, the only emission comes from the combustion of gaseous fuels. The emissions from the combustion are found to be much less than prescribed environmental norms. This process will produce energy in the form of Light Diesel Oil which is used to light furnaces," said the ministry.

The total cost of plant installation was Rs 1.79 crore and income from the byproducts is estimated to be Rs 17.5 lakh per annum. The maintenance cost of the plant is Rs 10.4 lakh per annum.

( With inputs from ANI )

Tags: Energy PlantindiaEast Coast RailwayWaste To Energy Plant
Open in App

Related Stories

InternationalIranian President Calls for Constructive Role of Brics to Halt West Asia Conflict During Talks With PM Modi

LifestyleEid 2026 Date: When Will Saudi Arabia, UAE and India Celebrate Eid-ul-Fitr?

MaharashtraMaharashtra CM Devendra Fadnavis Unfurls 200-Foot National Flag at Nagpur’s Kasturchand Park

NationalAhmedabad Traffic Update for India vs New Zealand T20 World Cup Final: Check Road Closures and Alternate Routes Near Narendra Modi Stadium

AurangabadLocal industries feel heat of Global conflict

National Realted Stories

NationalFast breeder reactors to deliver reliable, higher thermal efficiency: Govt

NationalGramin Vikas Bank cheating case: Former MLA Rajender Bharti seeks stay on conviction

NationalJob lure to sale plot: Policewomen rescue minor girl in Delhi, arrest accused

NationalBengal BJP candidate Dalim Roy injured during campaign, condition stable

NationalKarnataka Cong leaders allege LPG crisis, blame Centre for 'livelihood losses'