City
Epaper

India’s Nuclear Breakthrough Sets Stage for Realising Own Power Generation Dreams: Report

By IANS | Updated: May 11, 2026 00:41 IST

New Delhi, May 11 The Prototype Fast Breeder Reactor (PFBR) in Tamil Nadu's Kalpakkam achieved criticality recently, marking a ...

Open in App

New Delhi, May 11 The Prototype Fast Breeder Reactor (PFBR) in Tamil Nadu's Kalpakkam achieved criticality recently, marking a first, and paving the way for India to realise its own nuclear power generation dreams.

"This nuclear breakthrough will go a long way in making India self-sufficient amidst highly volatile situation in the West Asia and will also strengthen India's indigenous capability given its corresponding thrust in the Budget 2025-26," a leading portal Business Report said.

In the 2025-26 budget, the Centre had announced Nuclear Energy Mission setting a goal of achieving 100 GW of nuclear power generation capacity by 2047.

The milestone in civil nuclear programme, achieved after two decades of painstaking hard work, puts the country at the cusp of generating its own nuclear energy.

This also marked the second stage of India's three-stage nuclear power program, conceived by Dr. Homi Jehangir Bhabha and will soon position India into select league of nations.

The second stage criticality means the fast-breeder reactor will produce more fuel that it consumes, taking the country closer to its goal of long-term energy security.

The portal says that the fast-breeder reactors at Kalpakkam will now be used to breed Uranium-233 from thorium, thus laying the groundwork for Stage 3, where the nuclear reactors will be able to use India's vast thorium reserves at scale, using the Uranium-233 bred in Stage 2 as fuel.

"Since thorium is a near limitless source of energy, which can potentially power India for 400 years, the last phase of its nuclear programme holds the key to the country's long-term energy security," it said.

At present, the country's nuclear capacity stands at 8.78 Gigawatt (GW), with nuclear power accounting for nearly three per cent of its total electricity generation.

According to the portal, sustained and dedicated efforts are underway to scale the production to more than 22 GW in the next four to five years, with international co-operation.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Open in App

Related Stories

NationalGujarat: Preparations intensify for PM Modi's Vadodara roadshow after arrival in Jamnagar

Politics"Grave failure of state govt...": Karnataka BJP president slams Congress after gelatin sticks found near PM Modi's venue in Bengaluru

National"Hope he does good work for Bengal": TMC MP Abu Taher congratulates Suvendu Adhikari on becoming West Bengal CM

NationalPM Modi highlights Gujarat's industrial rise, BJP's electoral dominance in Jamnagar

International'Healthy and asymptomatic': Indian Embassy confirms safety of Indian crew on MV Hondius amid Hantavirus case

National Realted Stories

National"Huge contribution to patriotism if every house reduces edible oil use": PM Modi urges citizens to cut imports, embrace natural farming amid West Asia conflict

National616 FIRs, 646 arrested under 'Nasha Mukt J&K Abhiyaan', drug peddler's house demolished in Sopore

National“Not Just Bengal’s Story…”: Shiv Sena (UBT) MP Sanjay Raut on Kalyan Banerjee’s Remarks on I-PAC

NationalArmy backs women-run cafe at 13,000 feet near Baba Harbhajan Shrine in Sikkim

National'Double Engine' push: Railways approves Haiderpur-Badli Railway over bridge widening in Delhi