City
Epaper

Mizoram: Bairabi-Sairang rail line completed; to boost connectivity, tourism

By IANS | Updated: June 30, 2025 11:38 IST

Aizawl, June 30 In a major boost to connectivity in the Northeast, the construction of the much-awaited Bairabi-Sairang ...

Open in App

Aizawl, June 30 In a major boost to connectivity in the Northeast, the construction of the much-awaited Bairabi-Sairang railway line in Mizoram has been completed. The 51.38 km-long railway line will soon be inaugurated by Prime Minister Narendra Modi.

Speaking to IANS, Vinod Kumar, Chief Engineer of the project, said, “This has been one of the most challenging projects undertaken by Indian Railways. Every segment of this line posed unique difficulties. Due to heavy rainfall in the region, the working season is limited to just four months a year.”

The Bairabi-Sairang line connects the Mizoram capital, Aizawl, directly to the Indian railway network. Previously, the railway line extended only up to Bairabi, and further travel to Aizawl was only possible via road, a route often affected by landslides and weather disruptions.

With the completion of this line, direct rail connectivity from cities like Silchar and Guwahati to Aizawl will now be possible, reducing both travel time and logistical challenges.

The new line features four newly constructed stations in Mizoram: Hortoki, Kawnpui, Mualkhang, and Sairang. It is expected not only to ease passenger travel but also to significantly boost tourism and trade in the region.

Travel time between Silchar and Aizawl, which currently takes around eight hours by road, will be reduced to just three hours by train. Similarly, road travel from Guwahati to Aizawl, which typically takes 14-18 hours, will now be completed in about 12 hours by rail.

The foundation stone for the project was laid by PM Modi on November 29, 2014, and the project has taken nearly 11 years to complete.

Built at a cost of approximately Rs 5,021.45 crore, the project includes 48 tunnels with a combined length of 12,853 meters, and 142 iron bridges constructed to traverse the region's challenging terrain.

With its completion, the rail line that connects Bairabi and Sairang is expected to be a game-changer for Mizoram’s connectivity and economic growth.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Open in App

Related Stories

Other SportsAIFF urges ISL clubs to release 13 players for national camp amidst Durand Cup duties

EntertainmentPriyanka Chopra wishes in-laws Denise & Paul Kevin Jonas on 40 years of marital bliss

NationalGujarat’s ‘Pakistan Mohalla’ renamed ‘Hindustani Mohalla’

NationalAll 1,700 private schools in Delhi to come under fee regulation: Ashish Sood

NationalBengal CM Mamata meets Governor Bose at Raj Bhavan on I-Day

National Realted Stories

NationalIn her maiden I-Day speech, CM Rekha Gupta shares vision for developed and clean Delhi

NationalFrom staunch RSS cadre to esteemed politician, Nagaland Guv La. Ganesan dies in office

National‘Roadmap for prosperous India’: HM Amit Shah hails PM Modi’s I-Day address

NationalFollow Lord Krishna’s teachings to make nation stronger: President Droupadi Murmu

NationalKerala CM boycotts ‘At Home’ called by Guv