City
Epaper

PM Modi arrives at Chandigarh airport, to inaugurate Atal Tunnel at Rohtang today

By ANI | Updated: October 3, 2020 09:25 IST

Prime Minister Narendra Modi on Saturday morning arrived at the Chandigarh International Airport as he is scheduled to inaugurate the Atal Tunnel at Rohtang in Himachal Pradesh.

Open in App

Prime Minister Narendra Modi on Saturday morning arrived at the Chandigarh International Airport as he is scheduled to inaugurate the Atal Tunnel at Rohtang in Himachal Pradesh.

The inaugration ceremony will take place at 10 am today.

After inaugurating the tunnel, the Prime Minister will address a public gathering at Sissu, Lahaul Valley.

The Atal Tunnel, at 9.02 km is the longest highway tunnel in the world, connects Manali to Lahaul-Spiti Valley and will ensure movement throughout the year. Earlier, the Valley was cut off for about six months each year owing to heavy snowfall. The tunnel reduces the road distance by 46 kilometres between Manali and Leh and the time by about four to five hours.

The tunnel is built with ultra-modern specifications in the Pir Panjal range of Himalayas at an altitude of 3,000 metres (10,000 feet) from the Mean Sea Level (MSL).

"Fulfilling Atal Ji's dream of top quality infrastructure. Will be in Himachal Pradesh tomorrow to dedicate the #AtalTunnel in Rohtang to the nation. This is an iconic infrastructure project built at a height of 10,000 feet," Modi had tweeted on Friday.

"The #AtalTunnel will solve a major problem of connectivity in the region. It has several salient features and will further 'Ease of Living' for local citizens. Will also join public programmes in Sissu in Lahaul Spiti and at Solang Valley," he said in another tweet.

The South Portal (SP) of Atal Tunnel is located at a distance of 25 km from Manali at an altitude of 3,060 metres, while the North Portal (NP) of the tunnel is located near village Teling, Sissu, in Lahaul Valley at an altitude of 3,071 metres.

It is a horseshoe-shaped, single tube double lane tunnel with a roadway of eight metres. It has an overhead clearance of 5.525 metres. Also, it is 10.5-metre wide and has a 3.6 x 2.25 metres fire-proof emergency egress tunnel built into the main tunnel itself.Speaking about it, KP Purushothaman, Chief Engineer, Border Roads Orgsation (BRO) said the hard work by BRO in these many years had paid off and it is a very "proud moment" for everyone.

"This is a very proud moment not only for BRO but for the whole country. The hard work put in by BRO in the last 10 years is reaching the final stage. This tunnel is an example of Atmrbhar Bharat," Purushothaman had told .

"This is a very proud moment not only for BRO but for the whole country. The hard work put in by BRO in the last 10 years is reaching the final stage. This tunnel is an example of Atmrbhar Bharat," he had added.

( With inputs from ANI )

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: Narendra ModiNp
Open in App

Related Stories

NationalAmit Shah Sets Record as Longest-Serving Home Minister, Surpassing LK Advani

National“Made-in-India” Weapons Still Keeping Terrorists’ Masters Awake at Night: PM Modi

NationalRahul Gandhi Questions PM Modi on Trump’s “Five Jets Shot Down” Claims, Says “Country Has Right To Know”

NationalCabinet Approves PM Dhan-Dhanya Krishi Yojana to Boost Agriculture, Benefit 1.7 Crore Farmers

NationalChennai Metro Update: MRTS Handover to CMRL in Final Stage, Awaiting Railway Board and Minister's Nod

National Realted Stories

NationalFSSAI tested 86,401 food samples for pesticide residues; 2.8pc exceeded limits: Govt

NationalMadras HC fines ED Rs 30,000 for delay in filing counter-affidavit

NationalUttarakhand cloudburst: CM Dhami meets affected families, assures all possible assistance 

NationalPM Narendra Modi to Flag Off Nagpur-Pune Vande Bharat Express on August 10

NationalYouth's murder takes serious turn; bandh called in K'taka's Koppal district