City
Epaper

PM Modi inaugurates loco manufacturing railway workshop, flags off 1st 'made in Dahod' electric locomotive

By IANS | Updated: May 26, 2025 12:17 IST

Dahod, May 26 Prime Minister Narendra Modi on Monday inaugurated the Loco Manufacturing Shop-Rolling Stock Workshop in Dahod, ...

Open in App

Dahod, May 26 Prime Minister Narendra Modi on Monday inaugurated the Loco Manufacturing Shop-Rolling Stock Workshop in Dahod, Gujarat, and flagged off the first electric locomotive produced at the facility -- marking a significant infrastructure milestone for Indian Railways.

Dedicating the Dahod locomotive manufacturing unit to the nation, PM Modi highlighted the importance of the workshop, which has been built with an investment of Rs 20,000 crore.

The foundation stone for the project was laid in 2022, and within just three years, the state-of-the-art production centre was ready for operations.

The workshop has been designed with an annual production capacity of 120 electric locomotives, which can be scaled up to 150 units based on future requirements.

Under the Public Private Partnership (PPP) model, Indian Railways aims to manufacture 1,200 electric locomotives at this facility over the next decade.

Each of these 9,000 HP locomotives, aligned with PM Modi's vision of 'Make in India' and 'Atmanirbhar Bharat', will bear the tag 'Manufactured in Dahod'.

These high-powered engines are capable of hauling 4,600 tonnes of cargo and are planned for both domestic use and export.

In a first, these locomotives will include air conditioning and toilet facilities for drivers, significantly improving crew comfort.

Additionally, an advanced cover system has been installed to boost safety and help prevent accidents.

Currently, four locomotives are under production at the Dahod facility, all of which will carry the 'Manufactured in Dahod' label with pride.

These locomotives are expected to operate primarily on the Western Dedicated Freight Corridor (DFC) and graded railway sections.

Designed to pull container freight trains in double-stack configurations weighing up to 4,500 tonnes at 75 kmph on a one in 200 gradient, they aim to enhance the average speed of such trains from the current 20-25 kmph to around 50-60 kmph.

This leap in operational capabilities is expected to significantly boost freight throughput and enhance the line capacity across Indian Railways.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Open in App

Related Stories

Cricket"One of the memorable wins": Jwala Singh as India clinch Oval Test; draw series 2-2

InternationalMoldova becomes 107th member of International Solar Alliance

FootballCiting "uncertainty" over ISL's future, Bengaluru FC "indefinitely" suspends salaries of players

FootballAIFF officials to meet eight ISL club owners on Thursday to discuss uncertainty over league's future

InternationalIndia, New Zealand reaffirm strong defence ties, commitment to deepen cooperation

National Realted Stories

NationalKarti Chidambaram backs India's firm rebuttal to Trump's tariff move

NationalOdisha to set up 835 model primary schools in first phase of flagship scheme

NationalHow US encouraged India to buy Russian oil to stabilise global energy markets

NationalDelhi Crime: Girl Shot Dead Inside Doctor’s Clinic in Jahangirpuri; Attacker on the Run

NationalCong's Manish Tewari invokes 1971 to counter US tariff move on India