City
Epaper

PM Modi to inaugurate Pragati Maidan Integrated Transit Corridor project on June 19

By ANI | Updated: June 18, 2022 00:00 IST

Prime Minister Narendra Modi will dedicate to the nation the main tunnel and five underpasses of Pragati Maidan Integrated Transit Corridor Project on June 19 at 10:30 am.

Open in App

Prime Minister Narendra Modi will dedicate to the nation the main tunnel and five underpasses of Pragati Maidan Integrated Transit Corridor Project on June 19 at 10:30 am.

He will also address the gathering on the occasion. The Integrated Transit Corridor project is an integral part of Pragati Maidan Redevelopment Project.

The Integrated Transit Corridor project has been built at a cost of more than Rs 920 crore, entirely funded by the central government.

A PMO release said that the corridor is aimed at providing hassle-free and smooth access to the new world-class exhibition and convention centre being developed at Pragati Maidan to facilitate easy participation of exhibitors and visitors in the programmes held at the place.

"The impact of the project, however, will be much beyond Pragati Maidan as it will ensure hassle-free vehicular movement, helping save time and cost of commuters in a big way. It is part of the overarching vision of the government to ensure ease of living for people through transforming urban infrastructure," the release said.

The main tunnel connects Ring Road with India Gate via Purana Qila Road passing through Pragati Maidan.

The six-lane divided tunnel has multiple purposes, including access to the huge basement parking of Pragati Maidan.

The release said that a unique component of the tunnel is that two cross tunnels below the main tunnel road have been constructed in order to facilitate movement of the traffic from either side of the parking lot.

movement of the traffic from either side of the parking lot.

"It is equipped with the latest global standard facilities for smooth movement of traffic such as smart fire management, modern ventilation and automated drainage, digitally controlled CCTV and Public Announcement system inside the Tunnel," the release said.

This long-awaited tunnel will serve as an alternative route to Bhairon Marg, which is running much beyond its carriage capacity and is expected to take more than half of the traffic load of Bhairon Marg.

Along with the tunnel, there will be six underpasses - four on Mathura Road, one on Bhairon Marg and one on the intersection of Ring Road and Bhairon Marg.

( With inputs from ANI )

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: India Trade Promotion OrganisationIntegrated transit corridorindiaMathuraNarendra ModiIndiUk-indiaRepublic of indiaIndia indiaNarendra modi modiGia indiaBjp national general secretary organization
Open in App

Related Stories

CricketPM Modi Congratulates India's Women's Cricket Team After World Cup Win Over South Africa

MaharashtraSanjay Raut Health Scare: PM Modi Wishes Shiv Sena UBT Leader Speedy Recovery

Mumbai'Maharashtra Has Emerged as a Rising Force in the Maritime Sector,' Says CM Devendra Fadnavis (Watch Video)

EntertainmentPM Modi Pays Tribute to Satish Shah, Says He Will Be Remembered as a True Legend of Indian Entertainment

NationalGolden Power: Indian Women Now Hold 24,000 Tonnes of Gold, Outshining Global Investors

National Realted Stories

NationalThe grip of monopoly: Indian commerce as battleground in the British Parliament (From the Archives)

NationalHM Amit Shah blames 'Jungle Raj' for Bihar's industrial decline, vows to revive sugar mills

NationalNuapada bypoll: Naveen Patnaik calls BJP govt 'heroes in publicity, zero in performance'

NationalMental Health of Child Takes Priority: Uttarakhand High Court Rejects Grandfather’s Visitation Application

NationalHospitalisations under Bengal’s own health insurance scheme hit 1 crore: Mamata Banerjee