City
Epaper

Speeding up of trains on Indian Railways an ongoing exercise: Ashwini Vaishnaw

By ANI | Updated: August 7, 2021 05:40 IST

Answering a question in Rajya Sabha on Friday, Minister of Railways Ashwini Vaishnaw said that the speeding up of trains on the Indian Railways is an ongoing exercise.

Open in App

Answering a question in Rajya Sabha on Friday, Minister of Railways Ashwini Vaishnaw said that the speeding up of trains on the Indian Railways is an ongoing exercise.

"The trains are charted keeping in view the speed potential of the rolling stock used and also the Maximum Permissible Speed of the concerned section. It is also dependent on factors like availability/up-gradation of the track, doubling of the section, up-gradation of rolling stock etc. In its endeavour to speed up trains, IR during 2018-19 and 2019-20 have speeded up 140 and 70 train services respectively," the minister said.

To contain the spread of the COVID-19 pandemic, the Indian Railways discontinued all regular passenger carrying trains from March 23, 2020. "At present, only special trains keeping in view the concerns and suggestions of State Governments and health advisories, are being operated. However, during 2020-21, it has been decided to speed up 488 train services," the minister said.

Further, he informed that the up-gradation of track infrastructure is done through regular track renewal works, as and when the track becomes due for renewal based on criteria stipulated in Indian Railway Permanent Way Manual (IRPWM).

The up-gradation of track caters for raising the sectional speed of sections up to 130 kmph. The minister enlisted the steps which are being taken to improve the railway tracks.

"During 2020-21, 4363 km (in Complete Track Renewal units) track renewal had been carried out. For the current year i.e. 2021-22, 751 km (in Complete Track Renewal units) track renewal has been carried out up to June 2021," he informed.

Further, he added that the modern track structure consisting of Pre-Stressed Concrete Sleeper (PSC) Normal/Wide base sleepers with elastic fastening, 60kg, 90 or higher Ultimate Tensile Strength (UTS) rails, fan-shaped layout turnout on PSC sleepers, Steel Channel Sleepers on girder bridges are being used while carrying out primary track renewals.

"Long rail panels of 260 M/130M length are being manufactured at the steel plant to minimize the number of Alumino Thermit joints in the track, and provision of Thick Web Switches (TWS) has been planned for all important routes of Indian Railways. To expedite the provision of TWS, procurement of Thick Web Switches has been decentralized to zonal railways," Vaishnaw said.

( With inputs from ANI )

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: Indian railway permanent way manualIndian RailwaysMinistry of indian railwaysIndian railways ministryIndian railway networkBangladesh railwaysThe indian railwaysMumbai suburban network of railwaysIndian railways railwaysBangladesh railways ministryMumbai suburban railways
Open in App

Related Stories

NationalIndian Railways Suspends 4 Officials for Providing 'Unfit' Train Coaches to BSF Jawans (Watch Video)

MumbaiIndian Railways to Introduce New-Design Non-AC Local Trains With Automatic Doors by January 2026

NagpurNagpur Railway Passengers Cancel Tickets Worth Rs 60 Crore Due to Delayed, Unreliable Train Services

NationalWill Mandatory e-Aadhaar Verification by Indian Railways End Tatkal Ticketing Chaos?

NationalPM Narendra Modi To Launch Multiple Projects Worth Over Rs 77,000 Crore in Gujarat

National Realted Stories

NationalHealth boost for Delhi: 33 Arogya Mandirs and 17 Jan Aushadhi Kendras inaugurated

NationalLast rites of pilot Rajveer Singh performed in Jaipur as emotional tributes poured in

NationalBus plunges into deep gorge in Himachal's Mandi, one dead

NationalPF Withdrawal: EPFO Urges Members to Avoid Approaching Unauthorised Agents and Use Official EPFO Portals for Free and Secure Online Services

NationalCollege student gang-raped in Odisha's Ganjam beach,10 detained